Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 3269 | Pottery Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0219 # 01 Y:2019 | 01 | 2019 | REPLACE BOILER | $68,168 | $25,600 | Not Implemented |
IC0219 # 02 Y:2019 | 02 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $30,480 | $17,728 | Not Implemented |
IC0219 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,919 | $737 | Not Implemented |
BD0269 # 14 Y:2004 | 14 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $236 | $70 | Implemented |
BD0269 # 16 Y:2004 | 16 | 2004 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $423 | $746 | Implemented |
BD0269 # 15 Y:2004 | 15 | 2004 | METER WASTE WATER | $587 | $165 | Implemented |
BD0269 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,588 | $225 | Implemented |
BD0269 # 13 Y:2004 | 13 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $274 | $850 | Not Implemented |
BD0269 # 12 Y:2004 | 12 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $373 | $368 | Implemented |
BD0269 # 11 Y:2004 | 11 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $680 | $500 | Implemented |
BD0269 # 10 Y:2004 | 10 | 2004 | INSTALL OCCUPANCY SENSORS | $1,157 | $1,200 | Not Implemented |
BD0269 # 09 Y:2004 | 09 | 2004 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,243 | $2,000 | Implemented |
BD0269 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,601 | $731 | Implemented |
BD0269 # 07 Y:2004 | 07 | 2004 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $1,363 | $340 | Implemented |
BD0269 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,736 | $0 | Implemented |
BD0269 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,779 | $42 | Not Implemented |
BD0269 # 04 Y:2004 | 04 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,160 | $5,500 | Implemented |
BD0269 # 03 Y:2004 | 03 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,822 | $1,400 | Implemented |
BD0269 # 02 Y:2004 | 02 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $3,568 | $3,200 | Implemented |
IC0045 # 01 Y:2002 | 01 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $7,422 | $1,320 | n/a |
IC0045 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,857 | $7,199 | n/a |
IC0045 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,831 | $62,835 | n/a |
IC0045 # 04 Y:2002 | 04 | 2002 | INSTALL OCCUPANCY SENSORS | $4,970 | $12,088 | n/a |
IC0045 # 05 Y:2002 | 05 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $251 | $223 | n/a |
IC0045 # 07 Y:2002 | 07 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $910 | $625 | n/a |