Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
725
matching recommendationsSIC | 327 | Concrete, Gypsum, And Plaster Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0570 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,252 | $5,000 | Implemented |
LE0570 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $25,168 | $26,500 | Implemented |
LE0570 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $55,246 | $42,000 | Implemented |
LE0570 # 06 Y:2024 | 06 | 2024 | INSTALL BACK-UP EQUIPMENT | $46,731 | $90,000 | Implemented |
LE0570 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,515 | $15,000 | Implemented |
LE0570 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,292 | $0 | Implemented |
UW2404 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,140 | $25,000 | Implemented |
UW2404 # 05 Y:2024 | 05 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $15,990 | $112,500 | Implemented |
UW2404 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $141,402 | $150,381 | Implemented |
UW2404 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,693 | $75,000 | Implemented |
UW2317 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $533 | $0 | Implemented |
UW2317 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $658 | $1,096 | Implemented |
UW2317 # 04 Y:2023 | 04 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $31,756 | $1,000,000 | Implemented |
UW2317 # 05 Y:2023 | 05 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $30,104 | $300,000 | Implemented |
UW2317 # 03 Y:2023 | 03 | 2023 | INSTALL STORM WINDOWS AND DOORS | $156 | $1,901 | Implemented |
UW2315 # 01 Y:2023 | 01 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,189 | $1,896 | Implemented |
UW2315 # 02 Y:2023 | 02 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $30,104 | $300,000 | Implemented |
UF0601 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,983 | $0 | Implemented |
UF0601 # 03 Y:2023 | 03 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $280,640 | $30,000 | Implemented |
UF0601 # 02 Y:2023 | 02 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,202,647 | $3,920,000 | Implemented |
UF0601 # 07 Y:2023 | 07 | 2023 | LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA | $61,813 | $29,295 | Implemented |
UF0601 # 06 Y:2023 | 06 | 2023 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $74,558 | $0 | Implemented |
UF0601 # 08 Y:2023 | 08 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $34,014 | $3,179 | Implemented |
UF0601 # 04 Y:2023 | 04 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $32,141 | $49,680 | Implemented |
CM1022 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,106 | $92,608 | Implemented |