IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,524

matching recommendations
Reset
SIC 327 Concrete, Gypsum, And Plaster Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0032 # 03 Y:2002 03 2002 $60,800 $5,460 Not Implemented
MI0032 # 04 Y:2002 04 2002 $60,800 $925 Not Implemented
MI0032 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $39,066 $2,938 Not Implemented
OK0635 # 01 Y:2002 01 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,947 $9,900 Not Implemented
OK0635 # 02 Y:2002 02 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,136 $4,000 Not Implemented
OK0635 # 03 Y:2002 03 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $9,648 $6,750 Not Implemented
OK0635 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $4,152 $1,635 Not Implemented
OK0635 # 05 Y:2002 05 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,873 $300 Implemented
OK0635 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,624 $2,468 Implemented
OK0635 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,070 $200 Implemented
OK0635 # 08 Y:2002 08 2002 $4,200 $7,500 Not Implemented
OK0635 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,632 $440 Implemented
OK0635 # 10 Y:2002 10 2002 INSTALL OCCUPANCY SENSORS $798 $1,287 Not Implemented
OK0635 # 11 Y:2002 11 2002 INSTALL SET-BACK TIMERS $149 $312 Implemented
UM0212 # 01 Y:2002 01 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $59,075 $182,900 Not Implemented
UM0212 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,000 $10,035 Not Implemented
UM0212 # 03 Y:2002 03 2002 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,407 $500 Not Implemented
UM0212 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $2,000 $1,000 Not Implemented
UM0212 # 05 Y:2002 05 2002 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,885 $2,786 Not Implemented
UM0212 # 06 Y:2002 06 2002 OPTIMIZE PLANT POWER FACTOR $1,270 $3,417 Not Implemented
LE0109 # 01 Y:2001 01 2001 USE SYNTHETIC LUBRICANT $1,868 $200 Implemented
LE0109 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,400 $0 Implemented
LE0109 # 03 Y:2001 03 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,978 $2,500 Not Implemented
LE0109 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,570 $500 Implemented
LE0109 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,090 $1,000 Not Implemented