IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 327 Concrete, Gypsum, And Plaster Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0433 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $37,193 $1,000 Implemented
UM0433 # 03 Y:2013 03 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $22,580 $1,000 Not Implemented
UM0433 # 02 Y:2013 02 2013 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $19,439 $2,500 Implemented
UM0433 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,008 $21,730 Not Implemented
UM0212 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,000 $10,035 Not Implemented
UM0212 # 06 Y:2002 06 2002 OPTIMIZE PLANT POWER FACTOR $1,270 $3,417 Not Implemented
UM0212 # 05 Y:2002 05 2002 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,885 $2,786 Not Implemented
UM0212 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $2,000 $1,000 Not Implemented
UM0212 # 03 Y:2002 03 2002 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,407 $500 Not Implemented
UM0212 # 01 Y:2002 01 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $59,075 $182,900 Not Implemented
ND0247 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $182 $340 Not Implemented
ND0247 # 02 Y:1996 02 1996 INSTALL OCCUPANCY SENSORS $238 $400 Implemented
ND0247 # 03 Y:1996 03 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $140 $840 Not Implemented
ND0247 # 04 Y:1996 04 1996 USE PHOTOCELL CONTROLS $780 $600 Not Implemented
ND0247 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $297 $243 Implemented
ND0247 # 06 Y:1996 06 1996 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $16,775 $12,966 Not Implemented
ND0247 # 07 Y:1996 07 1996 PAY UTILITY BILLS ON TIME $2,142 $0 Implemented
ND0247 # 08 Y:1996 08 1996 ELIMINATE/REDUCE AN OPERATION $1,497 $190 Not Implemented