IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
SIC 3271 Concrete Block And Brick
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0603 # 05 Y:2023 05 2023 USE PHOTOCELL CONTROLS $3,805 $9,018 Implemented
SF0603 # 07 Y:2023 07 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $608 $2,572 Implemented
SF0603 # 06 Y:2023 06 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,772 $124,644 Implemented
SF0603 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,983 $141 Implemented
SF0603 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,760 $1,440 Implemented
SF0603 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,008 $7,651 Implemented
UA0207 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,657 $5,249 Implemented
BS0064 # 01 Y:2015 01 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,694 $503 Implemented
BS0064 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $98 $200 Implemented
TT0058 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,034 $0 Implemented
TT0058 # 04 Y:2010 04 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $584 $850 Implemented
NC0329 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,379 $2,200 Implemented
NC0329 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $149 $249 Implemented
NC0329 # 04 Y:2005 04 2005 DEVELOP A REPAIR/REPLACE POLICY $38 $28 Implemented
NC0329 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $400 $200 Implemented
SU0215 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,058 $0 Implemented
SU0215 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,078 $579 Implemented
SU0215 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,712 $488 Implemented
SU0215 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $1,814 $1,000 Implemented
SU0215 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,264 $0 Implemented
UD0574 # 04 Y:1999 04 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,572 $0 Implemented
CO0436 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $566 Implemented
CO0436 # 03 Y:1999 03 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,460 $0 Implemented
CO0436 # 04 Y:1999 04 1999 $31,100 $0 Implemented
SD0111 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $251 $320 Implemented