Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

736

matching recommendations
Reset
SIC 3272 Concrete Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0044 # 07 Y:2002 07 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,746 $1 Not Implemented
UF0296 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,883 $7,110 Not Implemented
UF0296 # 02 Y:2002 02 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $10,820 $15,547 Not Implemented
UF0296 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,012 $230 Implemented
UF0296 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,442 $10,641 Not Implemented
UF0296 # 05 Y:2002 05 2002 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $13,799 $202,500 Not Implemented
UF0296 # 06 Y:2002 06 2002 METER WASTE WATER $1,066 $1,700 Implemented
UF0296 # 07 Y:2002 07 2002 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $728 $0 Not Implemented
MI0032 # 01 Y:2002 01 2002 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $132,680 $46,380 Not Implemented
MI0032 # 02 Y:2002 02 2002 INSTALL BACK-UP EQUIPMENT $72,800 $35,000 Implemented
MI0032 # 03 Y:2002 03 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $60,800 $5,460 Not Implemented
MI0032 # 04 Y:2002 04 2002 INSTALL SENSORS TO DETECT DEFECTS $60,800 $925 Not Implemented
MI0032 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $39,066 $2,938 Not Implemented
OK0635 # 01 Y:2002 01 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,947 $9,900 Not Implemented
OK0635 # 02 Y:2002 02 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,136 $4,000 Not Implemented
OK0635 # 03 Y:2002 03 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $9,648 $6,750 Not Implemented
OK0635 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $4,152 $1,635 Not Implemented
OK0635 # 05 Y:2002 05 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,873 $300 Implemented
OK0635 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,624 $2,468 Implemented
OK0635 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,070 $200 Implemented
OK0635 # 08 Y:2002 08 2002 CHANGE OPERATING CONDITIONS $4,200 $7,500 Not Implemented
OK0635 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,632 $440 Implemented
OK0635 # 10 Y:2002 10 2002 INSTALL OCCUPANCY SENSORS $798 $1,287 Not Implemented
OK0635 # 11 Y:2002 11 2002 INSTALL SET-BACK TIMERS $149 $312 Implemented
CO0470 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,490 $5,000 Not Implemented