IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

736

matching recommendations
Reset
SIC 3272 Concrete Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0891 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $47,301 $12,500 Not Implemented
GT0891 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $34,362 $25,440 Implemented
GT0891 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,852 $88,000 Implemented
GT0891 # 08 Y:2012 08 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $3,990 $12,300 Not Implemented
GT0891 # 09 Y:2012 09 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,190 $12,795 Not Implemented
GT0891 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,720 $20,395 Not Implemented
CO0654 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,900 $17,990 Implemented
CO0654 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $570 $820 Implemented
CO0654 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,130 $1,990 Implemented
CO0654 # 01 Y:2012 01 2012 REPAIR AND ELIMINATE STEAM LEAKS $8,050 $1,440 Implemented
CO0633 # 06 Y:2010 06 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $3,550 $21,000 Not Implemented
CO0633 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,680 $25,000 Implemented
CO0633 # 04 Y:2010 04 2010 INSULATE BARE EQUIPMENT $1,210 $430 Not Implemented
CO0633 # 03 Y:2010 03 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,750 $7,500 Not Implemented
CO0633 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,430 $1,000 Implemented
CO0633 # 01 Y:2010 01 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,340 $2,810 Not Implemented
WV0391 # 01 Y:2009 01 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $27,893 $26,000 Not Implemented
WV0391 # 02 Y:2009 02 2009 USE PHOTOCELL CONTROLS $11,811 $6,850 Not Implemented
WV0391 # 03 Y:2009 03 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,520 $800 Implemented
WV0391 # 04 Y:2009 04 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,238 $8,890 Not Implemented
WV0391 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,896 $8,900 Not Implemented
WV0391 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,483 $105 Implemented
WV0391 # 07 Y:2009 07 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $3,782 $8,543 Not Implemented
WV0391 # 08 Y:2009 08 2009 DEVELOP A REPAIR/REPLACE POLICY $2,651 $605 Implemented
WV0391 # 09 Y:2009 09 2009 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,609 $1,000 Implemented