IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

736

matching recommendations
Reset
SIC 3272 Concrete Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0837 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,300 $3,250 Implemented
GT0837 # 03 Y:2007 03 2007 REPAIR AND ELIMINATE STEAM LEAKS $14,528 $1,800 Implemented
GT0837 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $47,920 $0 Implemented
GT0837 # 05 Y:2007 05 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $13,963 $0 Implemented
GT0837 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,571 $7,090 Implemented
GT0837 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,118 $41,616 Not Implemented
MI0144 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,115 $1,074 Not Implemented
MI0144 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,559 $22,932 Not Implemented
MI0144 # 03 Y:2007 03 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,832 $6,430 Not Implemented
MI0144 # 04 Y:2007 04 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,878 $135 Not Implemented
MI0144 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,578 $30 Not Implemented
CO0594 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $4,730 $3,350 Not Implemented
CO0594 # 02 Y:2006 02 2006 OPTIMIZE PLANT POWER FACTOR $4,550 $11,320 Not Implemented
CO0594 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,300 $6,900 Not Implemented
CO0594 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $150 $442 Not Implemented
CO0594 # 05 Y:2006 05 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $380 $0 Not Implemented
CO0594 # 06 Y:2006 06 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,200 $5,050 Not Implemented
CO0594 # 07 Y:2006 07 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $1,100 $2,950 Not Implemented
CO0594 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $990 $3,420 Not Implemented
CO0594 # 09 Y:2006 09 2006 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $950 $500 Not Implemented
CO0594 # 10 Y:2006 10 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $360 $90 Not Implemented
OR0504 # 01 Y:2006 01 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $64,300 $20,000 Implemented
OR0504 # 02 Y:2006 02 2006 REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS $22,500 $44,500 Implemented
OR0504 # 03 Y:2006 03 2006 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $84,100 $0 Not Implemented
OR0504 # 04 Y:2006 04 2006 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $28,000 $0 Not Implemented