Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 3272 | Concrete Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0893 # 09 Y:2013 | 09 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,862 | $19,001 | Not Implemented |
UD0893 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $350 | $250 | Not Implemented |
UD0893 # 01 Y:2013 | 01 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $711 | $0 | Implemented |
UD0893 # 03 Y:2013 | 03 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $184 | $0 | Implemented |
UD0893 # 04 Y:2013 | 04 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,267 | $4,330 | Not Implemented |
UD0893 # 10 Y:2013 | 10 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $974 | $10,900 | Implemented |
UD0893 # 06 Y:2013 | 06 | 2013 | REPLACE AIR CURTAIN DOORS WITH SOLID DOORS | $1,159 | $1,578 | Implemented |
UD0893 # 07 Y:2013 | 07 | 2013 | REPAIR OR REPLACE STEAM TRAPS | $3,389 | $9,600 | Implemented |
UD0893 # 08 Y:2013 | 08 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,001 | $500 | Not Implemented |
UD0893 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $26 | $0 | Not Implemented |
UD0577 # 06 Y:1999 | 06 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,171 | $2,655 | Not Implemented |
UD0577 # 05 Y:1999 | 05 | 1999 | INSTALL EQUIPMENT TO MOVE PRODUCT | $35,600 | $57,000 | Not Implemented |
UD0577 # 04 Y:1999 | 04 | 1999 | RECOVER AND REUSE WASTE MATERIAL | $88,813 | $200,000 | Not Implemented |
UD0577 # 03 Y:1999 | 03 | 1999 | EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME | $118,825 | $15,000 | Not Implemented |
UD0577 # 02 Y:1999 | 02 | 1999 | INSTALL EQUIPMENT TO MOVE PRODUCT | $320,742 | $525,000 | Not Implemented |
UD0577 # 01 Y:1999 | 01 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $640,050 | $1,000,000 | Not Implemented |
UD0546 # 06 Y:1998 | 06 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $622 | $600 | Not Implemented |
UD0546 # 05 Y:1998 | 05 | 1998 | REDUCE SCRAP PRODUCTION | $1,933 | $0 | Not Implemented |
UD0546 # 04 Y:1998 | 04 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,403 | $4,000 | Implemented |
UD0546 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,450 | $6,900 | Not Implemented |
UD0546 # 02 Y:1998 | 02 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,580 | $0 | Implemented |
UD0546 # 01 Y:1998 | 01 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $4,349 | $0 | Implemented |
UD0390 # 01 Y:1992 | 01 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,324 | $600 | Not Implemented |
UD0390 # 04 Y:1992 | 04 | 1992 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,300 | $30,000 | Not Implemented |
UD0390 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $760 | $2,000 | Implemented |