IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 3272 Concrete Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0635 # 10 Y:2002 10 2002 INSTALL OCCUPANCY SENSORS $798 $1,287 Not Implemented
OK0635 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,632 $440 Implemented
OK0635 # 08 Y:2002 08 2002 $4,200 $7,500 Not Implemented
OK0635 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,070 $200 Implemented
OK0635 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,624 $2,468 Implemented
OK0635 # 05 Y:2002 05 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,873 $300 Implemented
OK0635 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $4,152 $1,635 Not Implemented
OK0635 # 11 Y:2002 11 2002 INSTALL SET-BACK TIMERS $149 $312 Implemented
OK0635 # 03 Y:2002 03 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $9,648 $6,750 Not Implemented
OK0635 # 02 Y:2002 02 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,136 $4,000 Not Implemented
OK0635 # 01 Y:2002 01 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,947 $9,900 Not Implemented
OK0491 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $329 $655 Implemented
OK0491 # 07 Y:1996 07 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $109 $62 Implemented
OK0491 # 06 Y:1996 06 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $234 $400 Implemented
OK0491 # 04 Y:1996 04 1996 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS $9,832 $27,000 Not Implemented
OK0491 # 03 Y:1996 03 1996 USE OPTIMUM THICKNESS INSULATION $12,771 $37,950 Implemented
OK0491 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,329 $30 Implemented
OK0491 # 01 Y:1996 01 1996 BURN WASTE OIL FOR HEAT $1,349 $2,995 Not Implemented
OK0333 # 01 Y:1991 01 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,336 $0 Implemented
OK0333 # 08 Y:1991 08 1991 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $197 $410 Implemented
OK0333 # 07 Y:1991 07 1991 INSULATE FEEDWATER TANK $41 $66 Implemented
OK0333 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $117 $65 Implemented
OK0333 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $328 $0 Implemented
OK0333 # 04 Y:1991 04 1991 USE OPTIMUM THICKNESS INSULATION $4,914 $9,600 Implemented
OK0333 # 03 Y:1991 03 1991 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,653 $1,800 Implemented