IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

311

matching recommendations
Reset
SIC 3273 Ready-mixed Concrete
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0040 # 02 Y:2002 02 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,952 $0 Implemented
TA0040 # 03 Y:2002 03 2002 INCREASE EFFICIENCY OF TRUCKS $2,552 $0 Implemented
TA0040 # 04 Y:2002 04 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,210 $0 Not Implemented
TA0040 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $181 $90 Not Implemented
TA0040 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $140 $0 Not Implemented
TA0040 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $110 $130 Not Implemented
UM0212 # 01 Y:2002 01 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $59,075 $182,900 Not Implemented
UM0212 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,000 $10,035 Not Implemented
UM0212 # 03 Y:2002 03 2002 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,407 $500 Not Implemented
UM0212 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $2,000 $1,000 Not Implemented
UM0212 # 05 Y:2002 05 2002 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,885 $2,786 Not Implemented
UM0212 # 06 Y:2002 06 2002 OPTIMIZE PLANT POWER FACTOR $1,270 $3,417 Not Implemented
SF0181 # 01 Y:2000 01 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,763 $1,915 Not Implemented
SF0181 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $252 $654 Not Implemented
NV0110 # 01 Y:1998 01 1998 DIRECT WARMEST AIR TO COMBUSTION INTAKE $346 $133 n/a
NV0110 # 02 Y:1998 02 1998 REPLACE BOILER $3,636 $17,539 n/a
NV0110 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $450 $1,239 n/a
NV0110 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $721 $2,864 n/a
NV0110 # 05 Y:1998 05 1998 $6,200 $140 n/a
NV0110 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $877 $100 n/a
NV0110 # 07 Y:1998 07 1998 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $3,073 $193 n/a
NV0110 # 08 Y:1998 08 1998 RECOVER AND REUSE WASTE MATERIAL $10,351 $1,000 n/a
NV0109 # 01 Y:1998 01 1998 DIRECT WARMEST AIR TO COMBUSTION INTAKE $686 $550 Implemented
NV0109 # 02 Y:1998 02 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,687 $1,076 Implemented
NV0109 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,155 $4,348 Implemented