IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 3274 Lime
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0456 # 08 Y:2010 08 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,524 $0 Implemented
IA0456 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,544 $16,376 Implemented
IA0456 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,332 $3,835 Not Implemented
IA0456 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,800 $1,799 Implemented
IA0456 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $385 $717 Not Implemented
IA0456 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $657 $50 Implemented
IA0456 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $565 $50 Implemented
IA0456 # 07 Y:2010 07 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,067 $2,774 Not Implemented
AM0428 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,180 $500 Not Implemented
AM0428 # 01 Y:2003 01 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $13,600 $4,000 Implemented
AM0428 # 03 Y:2003 03 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,020 $0 Implemented
OK0641 # 07 Y:2002 07 2002 USE OPTIMUM THICKNESS INSULATION $194,258 $42,750 Implemented
OK0641 # 06 Y:2002 06 2002 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $47,600 $71,935 n/a
OK0641 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $265 $350 Not Implemented
OK0641 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $2,661 $8,000 n/a
OK0641 # 03 Y:2002 03 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $36,000 $64,800 n/a
OK0641 # 02 Y:2002 02 2002 INSTALL SET-BACK TIMERS $1,658 $238 Not Implemented
OK0641 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,032 $32,834 n/a
NV0153 # 01 Y:2000 01 2000 IMPROVE COMBUSTION CONTROL CAPABILITY $3,058 $5,650 Not Implemented
NV0153 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $12,568 $9,490 Implemented
NV0153 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $676 $200 Implemented
MS0132 # 07 Y:1999 07 1999 PAY BILLS ON TIME TO AVOID LATE FEES $724 $50 Implemented
MS0132 # 06 Y:1999 06 1999 APPLY FOR INVESTMENT INCENTIVES $105 $50 Implemented
MS0132 # 05 Y:1999 05 1999 BURN WASTE OIL FOR HEAT $2,969 $4,640 Not Implemented
MS0132 # 04 Y:1999 04 1999 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $188 $20 Implemented