Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
279
matching recommendationsSIC | 3275 | Gypsum Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2313 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,862 | $187 | Implemented |
UF0600 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,508 | $584 | Implemented |
UF0600 # 03 Y:2023 | 03 | 2023 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $4,976 | $11,866 | Implemented |
UF0600 # 05 Y:2023 | 05 | 2023 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,132 | $1,440 | Implemented |
UF0600 # 06 Y:2023 | 06 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,118 | $591 | Implemented |
UF0600 # 01 Y:2023 | 01 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $20,830 | $11,347 | Not Implemented |
UF0600 # 02 Y:2023 | 02 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $17,863 | $38,735 | Implemented |
UF0600 # 07 Y:2023 | 07 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $32,555 | $3,179 | Implemented |
UF0599 # 02 Y:2023 | 02 | 2023 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $57,942 | $18,000 | Implemented |
UF0599 # 08 Y:2023 | 08 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,851 | $24,000 | Implemented |
UF0599 # 10 Y:2023 | 10 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $34,250 | $2,384 | Implemented |
UF0599 # 11 Y:2023 | 11 | 2023 | LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA | $5,191 | $11,500 | Not Implemented |
UF0599 # 09 Y:2023 | 09 | 2023 | INSTALL TURBULATORS | $4,318 | $5,000 | Implemented |
UF0599 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,242 | $9,619 | Implemented |
UF0599 # 01 Y:2023 | 01 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $74,653 | $0 | Not Implemented |
UF0599 # 05 Y:2023 | 05 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $13,170 | $9,156 | Not Implemented |
UF0599 # 04 Y:2023 | 04 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $31,388 | $12,420 | Implemented |
UF0599 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,225 | $412 | Implemented |
UF0599 # 03 Y:2023 | 03 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $39,593 | $8,330 | Implemented |
NT0011 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,788 | $5,446 | Not Implemented |
NT0011 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,071 | $0 | Not Implemented |
NT0011 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,938 | $5,753 | Not Implemented |
NT0011 # 02 Y:2023 | 02 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,571 | $1,258 | Not Implemented |
NT0011 # 03 Y:2023 | 03 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,066 | $10,060 | Not Implemented |
NT0011 # 04 Y:2023 | 04 | 2023 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $36,183 | $19,507 | Not Implemented |