IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

279

matching recommendations
Reset
SIC 3275 Gypsum Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0322 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,372 $0 Not Implemented
UF0322 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,483 $47,300 Not Implemented
UF0322 # 08 Y:2003 08 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $81,073 $860 Not Implemented
UF0322 # 09 Y:2003 09 2003 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $159,201 $2,888 Not Implemented
UF0322 # 10 Y:2003 10 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,466 $3,496 Not Implemented
SF0201 # 01 Y:2000 01 2000 APPLY A PROTECTIVE COATING TO RACKS AND TANKS $4,646 $120 Implemented
SF0201 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,708 $25 Implemented
SF0201 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,492 $19,738 Implemented
SF0201 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,456 $15,452 Not Implemented
SF0201 # 05 Y:2000 05 2000 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $7,180 $11,750 Not Implemented
SF0201 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,796 $8,825 Implemented
SF0201 # 07 Y:2000 07 2000 RECOVER AND REUSE WASTE MATERIAL $12,259 $7,650 Implemented
SF0201 # 08 Y:2000 08 2000 RECOVER AND REUSE WASTE MATERIAL $1,635 $0 Implemented
SF0201 # 09 Y:2000 09 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $24,638 $18,750 Not Implemented
GT0666 # 01 Y:1999 01 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $30,744 $35,000 Implemented
GT0666 # 02 Y:1999 02 1999 ADJUST BURNERS FOR EFFICIENT OPERATION $366,782 $180,000 Implemented
GT0666 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,440 $450 Implemented
GT0666 # 04 Y:1999 04 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,598 $2,500 Implemented
GT0666 # 05 Y:1999 05 1999 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $30,735 $8,017 Not Implemented
GT0666 # 06 Y:1999 06 1999 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,354 $3,900 Not Implemented
GT0666 # 07 Y:1999 07 1999 INSULATE BARE EQUIPMENT $7,967 $8,398 Not Implemented
GT0666 # 08 Y:1999 08 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $38,797 $151,526 Implemented
GT0666 # 09 Y:1999 09 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $52,500 $45,000 Not Implemented
GT0666 # 10 Y:1999 10 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,800 $0 Implemented
AM0344 # 01 Y:1999 01 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $481,000 $1,207,000 Not Implemented