Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsSIC | 3275 | Gypsum Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0601 # 08 Y:2023 | 08 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $34,014 | $3,179 | Implemented |
UF0601 # 07 Y:2023 | 07 | 2023 | LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA | $61,813 | $29,295 | Implemented |
UF0601 # 06 Y:2023 | 06 | 2023 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $74,558 | $0 | Implemented |
UF0601 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,983 | $0 | Implemented |
UF0601 # 04 Y:2023 | 04 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $32,141 | $49,680 | Implemented |
UF0601 # 03 Y:2023 | 03 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $280,640 | $30,000 | Implemented |
UF0601 # 02 Y:2023 | 02 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,202,647 | $3,920,000 | Implemented |
UF0601 # 01 Y:2023 | 01 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,858,540 | $0 | Not Implemented |
UF0600 # 03 Y:2023 | 03 | 2023 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $4,976 | $11,866 | Implemented |
UF0600 # 01 Y:2023 | 01 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $20,830 | $11,347 | Not Implemented |
UF0600 # 02 Y:2023 | 02 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $17,863 | $38,735 | Implemented |
UF0600 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,508 | $584 | Implemented |
UF0600 # 05 Y:2023 | 05 | 2023 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,132 | $1,440 | Implemented |
UF0600 # 06 Y:2023 | 06 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,118 | $591 | Implemented |
UF0600 # 07 Y:2023 | 07 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $32,555 | $3,179 | Implemented |
UF0599 # 01 Y:2023 | 01 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $74,653 | $0 | Not Implemented |
UF0599 # 11 Y:2023 | 11 | 2023 | LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA | $5,191 | $11,500 | Not Implemented |
UF0599 # 10 Y:2023 | 10 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $34,250 | $2,384 | Implemented |
UF0599 # 09 Y:2023 | 09 | 2023 | INSTALL TURBULATORS | $4,318 | $5,000 | Implemented |
UF0599 # 08 Y:2023 | 08 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,851 | $24,000 | Implemented |
UF0599 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,225 | $412 | Implemented |
UF0599 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,242 | $9,619 | Implemented |
UF0599 # 05 Y:2023 | 05 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $13,170 | $9,156 | Not Implemented |
UF0599 # 04 Y:2023 | 04 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $31,388 | $12,420 | Implemented |
UF0599 # 03 Y:2023 | 03 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $39,593 | $8,330 | Implemented |