IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3275 Gypsum Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0239 # 08 Y:1998 08 1998 ADOPT IN-HOUSE MATERIAL GENERATION $72,397 $325,070 Not Implemented
AS0239 # 07 Y:1998 07 1998 MINIMIZE WATER USAGE $18,668 $82,192 Not Implemented
AS0239 # 06 Y:1998 06 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $7,760 $120 Not Implemented
AS0239 # 05 Y:1998 05 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $141,705 $103,000 Not Implemented
AS0239 # 04 Y:1998 04 1998 USE OPTIMUM THICKNESS INSULATION $11,065 $3,346 Not Implemented
AS0239 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,473 $23,248 Not Implemented
AS0239 # 02 Y:1998 02 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,088 $3,600 Not Implemented
AS0239 # 01 Y:1998 01 1998 USE SYNTHETIC LUBRICANT $1,810 $1,710 Not Implemented
ME0252 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,186 $28,000 Implemented
ME0252 # 11 Y:1998 11 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $480 $0 Not Implemented
ME0252 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,928 $2,675 Implemented
ME0252 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $4,866 $6,900 Not Implemented
ME0252 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,171 $1,923 Implemented
ME0252 # 06 Y:1998 06 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,309 $1,457 Implemented
ME0252 # 07 Y:1998 07 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,213 $1,405 Implemented
ME0252 # 08 Y:1998 08 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $466 $225 Implemented
ME0252 # 09 Y:1998 09 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $233 $375 Implemented
ME0252 # 10 Y:1998 10 1998 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $89,700 $11,750 Implemented
ME0252 # 01 Y:1998 01 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $67,656 $52,600 Implemented
AR0144 # 09 Y:1998 09 1998 AUTOMATE PAYROLL SYSTEM $217,800 $85,000 Not Implemented
AR0144 # 08 Y:1998 08 1998 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $23,958 $0 Not Implemented
AR0144 # 07 Y:1998 07 1998 METER WASTE WATER $6,423 $500 Not Implemented
AR0144 # 06 Y:1998 06 1998 INSULATE BARE EQUIPMENT $7,588 $10,500 Not Implemented
AR0144 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,575 $160 Implemented
AR0144 # 04 Y:1998 04 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,876 $0 Not Implemented