IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 328 Cut Stone And Stone Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0922 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,604 $3,500 Implemented
GT0922 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $76,284 $79,761 Implemented
GT0922 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $6,827 $1,175 Implemented
GT0922 # 05 Y:2019 05 2019 PAY BILLS ON TIME TO AVOID LATE FEES $281 $1,190 Implemented
GT0922 # 01 Y:2019 01 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $8,082 $1,200 Implemented
GT0672 # 05 Y:1999 05 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,071 $51,281 Implemented
GT0672 # 01 Y:1999 01 1999 REDUCE FLUID FLOW RATES $4,090 $600 Implemented
GT0672 # 06 Y:1999 06 1999 USE POWER DURING OFF-PEAK PERIODS $32,520 $0 Implemented
GT0672 # 03 Y:1999 03 1999 MAINTAIN MACHINES TO REDUCE LEAKS $6,500 $5,000 Implemented
GT0608 # 10 Y:1997 10 1997 REPROCESS SPENT OILS ON SITE FOR RE-USE $2,500 $9,400 Implemented
GT0608 # 08 Y:1997 08 1997 DISCONNECT BALLASTS $552 $84 Implemented
GT0608 # 06 Y:1997 06 1997 USE GRAVITY FEEDS WHEREVER POSSIBLE $3,425 $5,130 Implemented
GT0608 # 04 Y:1997 04 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $7,317 $3,510 Implemented
GT0608 # 03 Y:1997 03 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $5,260 $4,000 Implemented
GT0608 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $426 $6,227 Implemented
GT0608 # 01 Y:1997 01 1997 COMBINE UTILITY METERS $8,120 $18,860 Implemented
GT0601 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,643 $350 Implemented
GT0601 # 06 Y:1996 06 1996 USE LESS WASTEFUL PACKAGING $21,600 $45,000 Implemented
GT0601 # 05 Y:1996 05 1996 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,830 $6,000 Implemented
GT0601 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,440 $12,710 Implemented
GT0547 # 06 Y:1995 06 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,980 $13,000 Implemented
GT0547 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $390 $300 Implemented
GT0547 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,170 $400 Implemented
GT0547 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,000 $21,180 Implemented
GT0439 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $183 $0 Implemented