IAC Assessment: GT0439
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0439
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1991
Principal Product DIMENSION STONE
NAICS n/a
SIC 3281 - Cut Stone And Stone Products
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 0
Annual Production 41,400 Tons
Production Hrs. Annual 2,040
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $531,322 6,179,953 kWh $0.09
Natural Gas $43,524 7,439 MMBtu $5.85
TOTAL ENERGY COSTS $574,846
RECOMMENDED SAVINGS* $66,921 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $66,921
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$500
Cost:
-
- - $800 138 $(-300) - -
-
kWh
$800
138
MMBtu
$(-300)
-
$
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$960
Cost:
-
- - $960 165 - - -
-
kWh
$960
165
MMBtu
-
-
$
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$158
Cost:
$289
- - $158 27 - - -
-
kWh
$158
27
MMBtu
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$37,560
Cost:
-
$37,560 - - - - - $37,560
-
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$183
Cost:
-
$238 2,931 - - $(-55) - $238
2,931
kWh
-
-
MMBtu
$(-55)
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,110
Cost:
$3,441
$3,110 38,980 - - - - $3,110
38,980
kWh
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,900
Cost:
$4,800
$17,900 223,916 - - - - $17,900
223,916
kWh
-
-
MMBtu
-
-
$
08: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$6,550
Cost:
$500
$6,550 81,770 - - - - $6,550
81,770
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$66,921
Cost:
$9,030
$65,358 347,597 $1,918 330 $(-355) - $65,358
347,597
kWh
$1,918
330
MMBtu
$(-355)
-
$
TOTAL IMPLEMENTED Savings:
$66,921
Cost:
$9,030
$65,358 347,597 $1,918 330 $(-355) - $65,358
347,597
kWh
$1,918
330
MMBtu
$(-355)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes