Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 3281 | Cut Stone And Stone Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0922 # 05 Y:2019 | 05 | 2019 | PAY BILLS ON TIME TO AVOID LATE FEES | $281 | $1,190 | Implemented |
GT0922 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $76,284 | $79,761 | Implemented |
GT0922 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,604 | $3,500 | Implemented |
GT0922 # 02 Y:2019 | 02 | 2019 | INSULATE BARE EQUIPMENT | $6,827 | $1,175 | Implemented |
GT0922 # 01 Y:2019 | 01 | 2019 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $8,082 | $1,200 | Implemented |
GT0672 # 06 Y:1999 | 06 | 1999 | USE POWER DURING OFF-PEAK PERIODS | $32,520 | $0 | Implemented |
GT0672 # 05 Y:1999 | 05 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,071 | $51,281 | Implemented |
GT0672 # 03 Y:1999 | 03 | 1999 | MAINTAIN MACHINES TO REDUCE LEAKS | $6,500 | $5,000 | Implemented |
GT0672 # 01 Y:1999 | 01 | 1999 | REDUCE FLUID FLOW RATES | $4,090 | $600 | Implemented |
GT0608 # 01 Y:1997 | 01 | 1997 | COMBINE UTILITY METERS | $8,120 | $18,860 | Implemented |
GT0608 # 10 Y:1997 | 10 | 1997 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $2,500 | $9,400 | Implemented |
GT0608 # 08 Y:1997 | 08 | 1997 | DISCONNECT BALLASTS | $552 | $84 | Implemented |
GT0608 # 06 Y:1997 | 06 | 1997 | USE GRAVITY FEEDS WHEREVER POSSIBLE | $3,425 | $5,130 | Implemented |
GT0608 # 04 Y:1997 | 04 | 1997 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,317 | $3,510 | Implemented |
GT0608 # 03 Y:1997 | 03 | 1997 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,260 | $4,000 | Implemented |
GT0608 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $426 | $6,227 | Implemented |
GT0601 # 06 Y:1996 | 06 | 1996 | USE LESS WASTEFUL PACKAGING | $21,600 | $45,000 | Implemented |
GT0601 # 05 Y:1996 | 05 | 1996 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $3,830 | $6,000 | Implemented |
GT0601 # 02 Y:1996 | 02 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,643 | $350 | Implemented |
GT0601 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,440 | $12,710 | Implemented |
GT0547 # 06 Y:1995 | 06 | 1995 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $7,980 | $13,000 | Implemented |
GT0547 # 04 Y:1995 | 04 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $390 | $300 | Implemented |
GT0547 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,170 | $400 | Implemented |
GT0547 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,000 | $21,180 | Implemented |
GT0439 # 01 Y:1991 | 01 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $500 | $0 | Implemented |