IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

611

matching recommendations
Reset
SIC 329 Misc. Nonmetallic Mineral Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0105 # 08 Y:1990 08 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,002 $500 Implemented
WI0105 # 11 Y:1990 11 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $213 $0 Implemented
OR0093 # 01 Y:1990 01 1990 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $554,932 $1,000 Implemented
OR0093 # 02 Y:1990 02 1990 INSTALL SET-BACK TIMERS $8,063 $1,000 Implemented
OR0093 # 03 Y:1990 03 1990 SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY $10,749 $5,000 Implemented
OR0093 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,398 $3,287 Implemented
OR0093 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $930 $3,000 Implemented
OR0092 # 01 Y:1990 01 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,335 $0 Implemented
OR0092 # 02 Y:1990 02 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,064 $150 Implemented
OR0092 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $120,588 $0 Implemented
OR0092 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $773 $839 Implemented
OR0092 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,870 $35,000 Implemented
GT0410 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $408 $325 Implemented
MO0004 # 02 Y:1990 02 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $750 $830 Implemented
MO0004 # 03 Y:1990 03 1990 INSULATE BARE EQUIPMENT $3,990 $1,676 Implemented
MO0004 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,866 $100 Implemented
MO0004 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,387 $244 Implemented
MO0004 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $949 $86 Implemented
RU0088 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $851 $650 Implemented
CO0176 # 01 Y:1990 01 1990 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $44,728 $40,000 Implemented
CO0176 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,650 $1,000 Implemented
CO0176 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,350 $1,800 Implemented
CO0176 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $270 $200 Implemented
CO0177 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,110 $12,000 Implemented
CO0177 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,950 $600 Implemented