IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
SIC 329 Misc. Nonmetallic Mineral Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0115 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $1,772 $2,333 Implemented
NV0115 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,937 $10,398 Implemented
NV0115 # 04 Y:1998 04 1998 $68,996 $19,100 Implemented
WV0145 # 21 Y:1998 21 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $18,689 $16,000 Implemented
WV0145 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $4,143 $734 Implemented
WV0145 # 09 Y:1998 09 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,762 $11,820 Implemented
WV0145 # 10 Y:1998 10 1998 DISCONNECT BALLASTS $3,120 $1,530 Implemented
WV0145 # 03 Y:1998 03 1998 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,936 $1,000 Implemented
WV0145 # 01 Y:1998 01 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,801 $1,250 Implemented
WV0145 # 15 Y:1998 15 1998 INSULATE BARE EQUIPMENT $2,343 $833 Implemented
WV0145 # 19 Y:1998 19 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $92,886 $11,000 Implemented
WV0145 # 16 Y:1998 16 1998 INSULATE BARE EQUIPMENT $527 $160 Implemented
WV0145 # 11 Y:1998 11 1998 USE SYNTHETIC LUBRICANT $1,076 $500 Implemented
NC0148 # 02 Y:1998 02 1998 REDUCE FLUID FLOW RATES $304 $550 Implemented
NC0148 # 03 Y:1998 03 1998 $7,677 $10,000 Implemented
NC0148 # 04 Y:1998 04 1998 $63,429 $80,000 Implemented
KU0501 # 07 Y:1998 07 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $460 $240 Implemented
KU0501 # 05 Y:1998 05 1998 USE SYNTHETIC LUBRICANT $560 $1,760 Implemented
KU0501 # 04 Y:1998 04 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $670 $440 Implemented
KU0501 # 02 Y:1998 02 1998 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $6,130 $6,880 Implemented
DS0121 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $240 $250 Implemented
DS0121 # 08 Y:1998 08 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $16,640 $0 Implemented
DS0121 # 07 Y:1998 07 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $700 $6 Implemented
DS0121 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $962 $74 Implemented
DS0121 # 03 Y:1998 03 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $679 $50 Implemented