IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,280

matching recommendations
Reset
SIC 329 Misc. Nonmetallic Mineral Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0503 # 08 Y:2001 08 2001 INSTALL OCCUPANCY SENSORS $508 $300 Implemented
MA0503 # 09 Y:2001 09 2001 INSULATE BARE EQUIPMENT $457 $500 Implemented
MA0499 # 01 Y:2001 01 2001 ADOPT IN-HOUSE MATERIAL GENERATION $268,341 $500,000 Not Implemented
MA0499 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $45,270 $154,000 Not Implemented
MA0499 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,963 $9,960 Not Implemented
MA0499 # 04 Y:2001 04 2001 USE MINIMUM SAFE OVEN VENTILATION $7,334 $14,200 Not Implemented
MA0499 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $5,936 $12,650 Not Implemented
MA0499 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,235 $255 Not Implemented
MA0499 # 07 Y:2001 07 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,219 $2,000 Not Implemented
CO0489 # 01 Y:2001 01 2001 INSTALL OCCUPANCY SENSORS $7,730 $35,830 Not Implemented
CO0489 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $7,010 $1,600 Not Implemented
CO0489 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $2,780 $1,760 Not Implemented
CO0489 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $1,500 $630 Implemented
CO0489 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,290 $0 Implemented
CO0489 # 06 Y:2001 06 2001 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,130 $2,170 Not Implemented
CO0489 # 07 Y:2001 07 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $15,440 $0 Implemented
CO0489 # 08 Y:2001 08 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $4,360 $4,000 Implemented
UF0278 # 01 Y:2001 01 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $46,074 $2,910 Not Implemented
UF0278 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190,612 $67,472 Implemented
UF0278 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $703 $621 Implemented
UF0278 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $56,760 $143,877 Implemented
UF0278 # 05 Y:2001 05 2001 OPTIMIZE PLANT POWER FACTOR $19,545 $36,000 Not Implemented
UF0278 # 06 Y:2001 06 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $26,575 $46,800 Not Implemented
UF0278 # 07 Y:2001 07 2001 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $191,133 $282,000 Not Implemented
UF0278 # 08 Y:2001 08 2001 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,102 $20,000 Not Implemented