IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

140

matching recommendations
Reset
SIC 329 Misc. Nonmetallic Mineral Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0901 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $1,149 $190 Not Implemented
UD0901 # 04 Y:2014 04 2014 RECOVER AND REUSE COOLING WATER $221,902 $100,000 Implemented
UD0901 # 05 Y:2014 05 2014 REDUCE FLUID FLOW RATES $151,019 $100,000 Implemented
UD0901 # 06 Y:2014 06 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $25,546 $28,000 Not Implemented
UD0901 # 07 Y:2014 07 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,426 $0 Not Implemented
UD0901 # 08 Y:2014 08 2014 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,748 $1,000 Not Implemented
UD0901 # 09 Y:2014 09 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $2,267 $8,850 Not Implemented
UD0901 # 10 Y:2014 10 2014 REDUCE VENTILATION AIR $31,388 $33,025 Implemented
UD0901 # 11 Y:2014 11 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,379 $16,055 Not Implemented
UD0869 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $753 $825 Implemented
UD0869 # 02 Y:2012 02 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,891 $0 Implemented
UD0869 # 03 Y:2012 03 2012 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $4,665 $2,000 Not Implemented
UD0869 # 04 Y:2012 04 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,400 $57,000 Not Implemented
UD0869 # 05 Y:2012 05 2012 UPGRADE CONTROLS ON COMPRESSORS $4,610 $8,000 Not Implemented
UD0869 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,808 $1,000 Implemented
UD0869 # 07 Y:2012 07 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,105 $400 Not Implemented
UD0869 # 08 Y:2012 08 2012 COVER OPEN TANKS $1,504 $1,000 Not Implemented
UD0869 # 09 Y:2012 09 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $64,740 $51,900 Not Implemented
UF0438 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $22,343 $1,105 Not Implemented
UF0438 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $85,202 $72,075 Not Implemented
UF0438 # 03 Y:2010 03 2010 AIR CONDITION ONLY SPACE NECESSARY $15,093 $1,615 Not Implemented
UF0438 # 04 Y:2010 04 2010 AIR CONDITION ONLY SPACE NECESSARY $10,754 $22,000 Not Implemented
UF0438 # 05 Y:2010 05 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $112,650 $154,062 Not Implemented
UF0438 # 06 Y:2010 06 2010 UPGRADE CONTROLS ON COMPRESSORS $24,615 $975 Not Implemented
UF0438 # 07 Y:2010 07 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $6,023 $3,670 Not Implemented