Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,265
matching recommendationsSIC | 329 | Misc. Nonmetallic Mineral Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0134 # 01 Y:2018 | 01 | 2018 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $599,971 | $264,049 | Not Implemented |
UU0134 # 02 Y:2018 | 02 | 2018 | IMPROVE COMBUSTION CONTROL CAPABILITY | $19,372 | $15,000 | Not Implemented |
UU0134 # 03 Y:2018 | 03 | 2018 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $8,796 | $22,888 | Not Implemented |
UU0134 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,606 | $2,052 | Not Implemented |
UU0134 # 05 Y:2018 | 05 | 2018 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,549 | $0 | Implemented |
NC0609 # 06 Y:2018 | 06 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $1,705 | $5,685 | Implemented |
NC0609 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,341 | $2,500 | Implemented |
NC0609 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $650 | $200 | Implemented |
NC0609 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $173 | $350 | Not Implemented |
NC0609 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,593 | $8,972 | Implemented |
NC0609 # 01 Y:2018 | 01 | 2018 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $9,405 | $0 | Not Implemented |
WV0554 # 12 Y:2018 | 12 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $221 | $516 | Implemented |
WV0554 # 11 Y:2018 | 11 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $424 | $133 | Implemented |
WV0554 # 10 Y:2018 | 10 | 2018 | INSTALL SET-BACK TIMERS | $974 | $2,132 | Not Implemented |
WV0554 # 09 Y:2018 | 09 | 2018 | MINIMIZE WATER USAGE | $1,354 | $700 | Implemented |
WV0554 # 08 Y:2018 | 08 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $1,406 | $632 | Implemented |
WV0554 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,081 | $5,593 | Implemented |
WV0554 # 06 Y:2018 | 06 | 2018 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $6,147 | $21,264 | Implemented |
WV0554 # 05 Y:2018 | 05 | 2018 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,868 | $1,000 | Implemented |
WV0554 # 04 Y:2018 | 04 | 2018 | INSULATE BARE EQUIPMENT | $16,102 | $29,747 | Not Implemented |
WV0554 # 03 Y:2018 | 03 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,149 | $77,350 | Not Implemented |
WV0554 # 02 Y:2018 | 02 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $17,639 | $30,000 | Implemented |
WV0554 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,731 | $32,581 | Not Implemented |
TR0007 # 05 Y:2018 | 05 | 2018 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $5,572 | $500 | Implemented |
TR0007 # 04 Y:2018 | 04 | 2018 | METER WASTE WATER | $6,760 | $2,650 | Not Implemented |