IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,265

matching recommendations
Reset
SIC 329 Misc. Nonmetallic Mineral Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0519 # 01 Y:2015 01 2015 UPGRADE CONTROLS ON COMPRESSORS $15,876 $6,475 Implemented
SD0519 # 02 Y:2015 02 2015 USE POWER DURING OFF-PEAK PERIODS $15,251 $10,325 Implemented
SD0519 # 03 Y:2015 03 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,091 $8,805 Not Implemented
SD0519 # 04 Y:2015 04 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,983 $16,500 Implemented
SD0519 # 05 Y:2015 05 2015 INSTALL TIMERS AND/OR THERMOSTATS $3,856 $210 Implemented
SD0519 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,572 $1,500 Implemented
UD0937 # 01 Y:2015 01 2015 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $8,087 $0 Implemented
UD0937 # 02 Y:2015 02 2015 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $6,573 $2,850 Not Implemented
UD0937 # 03 Y:2015 03 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,253 $0 Implemented
UD0937 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,762 $2,000 Not Implemented
UD0937 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $114 $150 Implemented
UD0937 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,682 $20,800 Not Implemented
UD0937 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,268 $4,200 Not Implemented
UD0937 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,212 $3,075 Not Implemented
UD0937 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $330 $1,911 Implemented
UD0937 # 10 Y:2015 10 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $948 $0 Implemented
OK0927 # 01 Y:2015 01 2015 COMBINE UTILITY METERS $19,646 $14,000 Not Implemented
OK0927 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,107 $133,275 Implemented
OR0649 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $18,604 $16,250 Not Implemented
OR0649 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,484 $2,065 Implemented
OR0649 # 03 Y:2015 03 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $2,825 $0 Not Implemented
OR0649 # 04 Y:2015 04 2015 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING $5,913 $4,455 Not Implemented
OR0649 # 05 Y:2015 05 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,536 $438 Not Implemented
OR0649 # 06 Y:2015 06 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $23,387 $10,298 Not Implemented
OR0649 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $572 $1,000 Not Implemented