ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1408 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,448 | $2,000 | Implemented |
UK1408 # 03 Y:2014 | 03 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $7,600 | $17,000 | Not Implemented |
UK1408 # 04 Y:2014 | 04 | 2014 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $40,960 | $204,000 | Not Implemented |
UK1408 # 05 Y:2014 | 05 | 2014 | OPTIMIZE PLANT POWER FACTOR | $36,000 | $32,528 | Implemented |
UK1408 # 06 Y:2014 | 06 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $217,346 | $140,476 | Not Implemented |
UK1408 # 07 Y:2014 | 07 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $580,500 | $386,500 | Not Implemented |
UK1408 # 01 Y:2014 | 01 | 2014 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $15,613 | $3,894 | Not Implemented |
UD0909 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $667 | $2,940 | Implemented |
UD0909 # 11 Y:2014 | 11 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $7,664 | $8,319 | Not Implemented |
UD0909 # 12 Y:2014 | 12 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,987 | $17,000 | Not Implemented |
UD0909 # 10 Y:2014 | 10 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $797 | $0 | Implemented |
UD0909 # 09 Y:2014 | 09 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $797 | $0 | Implemented |
UD0909 # 01 Y:2014 | 01 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $20,106 | $510 | Not Implemented |
UD0909 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,032 | $1,000 | Implemented |
UD0909 # 08 Y:2014 | 08 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,327 | $3,000 | Not Implemented |
UD0909 # 06 Y:2014 | 06 | 2014 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,214 | $5,000 | Implemented |
UD0909 # 02 Y:2014 | 02 | 2014 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,680 | $1,125 | Implemented |
UD0909 # 03 Y:2014 | 03 | 2014 | INSTALL OCCUPANCY SENSORS | $16,710 | $4,000 | Not Implemented |
UD0909 # 04 Y:2014 | 04 | 2014 | INSTALL SPECTRAL REFLECTORS / DELAMP | $759 | $500 | Not Implemented |
UD0901 # 03 Y:2014 | 03 | 2014 | INSTALL OCCUPANCY SENSORS | $1,149 | $190 | Not Implemented |
UD0901 # 04 Y:2014 | 04 | 2014 | RECOVER AND REUSE COOLING WATER | $221,902 | $100,000 | Implemented |
UD0901 # 05 Y:2014 | 05 | 2014 | REDUCE FLUID FLOW RATES | $151,019 | $100,000 | Implemented |
UD0901 # 06 Y:2014 | 06 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $25,546 | $28,000 | Not Implemented |
UD0901 # 07 Y:2014 | 07 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,426 | $0 | Not Implemented |
UD0901 # 08 Y:2014 | 08 | 2014 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,748 | $1,000 | Not Implemented |