IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,364

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UMS004 # 02 Y:2012 02 2012 CONVERT TO OXYFUEL BURNERS $156,000 $250,000 Not Implemented
UMS004 # 03 Y:2012 03 2012 COVER OPEN TANKS $41,000 $32,000 Not Implemented
UMS004 # 04 Y:2012 04 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $27,600 $75,000 Not Implemented
UMS004 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,500 $0 Not Implemented
UMS004 # 06 Y:2012 06 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $40,000 $40,000 Not Implemented
UMS004 # 07 Y:2012 07 2012 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $1,300 $0 Not Implemented
LE0331 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $59,232 $1,300 Not Implemented
LE0331 # 02 Y:2012 02 2012 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $42,903 $73,485 Not Implemented
LE0331 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,201 $136,500 Not Implemented
LE0331 # 04 Y:2012 04 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $24,579 $0 Implemented
LE0331 # 05 Y:2012 05 2012 REDESIGN PROCESS $20,100 $0 Implemented
LE0331 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,156 $12,800 Not Implemented
LE0331 # 07 Y:2012 07 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,134 $2,500 Implemented
LE0331 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,005 $1,000 Implemented
LE0331 # 09 Y:2012 09 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $805 $125 Not Implemented
SU0315 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,327 $0 Not Implemented
SU0315 # 02 Y:2012 02 2012 RECOVER AND REUSE SPENT ACID BATHS $28,847 $792 Not Implemented
SU0315 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,269 $1,357 Not Implemented
SU0315 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $317 $140 Not Implemented
SU0315 # 05 Y:2012 05 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $149 $652 Not Implemented
SU0315 # 06 Y:2012 06 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $33,502 $167,290 Not Implemented
SU0315 # 07 Y:2012 07 2012 OPTIMIZE PLANT POWER FACTOR $8,366 $42,403 Not Implemented
SU0315 # 08 Y:2012 08 2012 UPGRADE OBSOLETE EQUIPMENT $82 $436 Not Implemented
OK0819 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,728 $10,884 Not Implemented
OK0819 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,891 $16,296 Not Implemented