IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,364

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0785 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,225 $56,686 Not Implemented
OK0785 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $644 $5,222 Not Implemented
OK0785 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,602 $0 Implemented
OK0785 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $563 $0 Implemented
UD0811 # 01 Y:2010 01 2010 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $27,175 $0 Not Implemented
UD0811 # 02 Y:2010 02 2010 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $7,064 $13,132 Not Implemented
UD0811 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $897 $1,000 Not Implemented
UD0811 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $646 $0 Not Implemented
UD0811 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,579 $50,000 Not Implemented
NC0397 # 01 Y:2010 01 2010 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $12,960 $17,280 Not Implemented
NC0397 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $712 $1,000 Not Implemented
NC0397 # 03 Y:2010 03 2010 INSULATE BARE EQUIPMENT $1,212 $3,660 Not Implemented
NC0397 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $492 $751 Not Implemented
NC0397 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,804 $12,206 Implemented
NC0397 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $399 $100 Implemented
UD0808 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $200,411 $425,000 Not Implemented
UD0808 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $108,914 $25,000 Not Implemented
UD0808 # 03 Y:2009 03 2009 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $95,164 $300,000 Not Implemented
UD0808 # 04 Y:2009 04 2009 OPTIMIZE PLANT POWER FACTOR $74,208 $223,000 Not Implemented
UD0808 # 05 Y:2009 05 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $68,888 $60,000 Not Implemented
UD0808 # 06 Y:2009 06 2009 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $67,977 $135,954 Not Implemented
UD0808 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,538 $59,100 Not Implemented
UD0808 # 08 Y:2009 08 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,197 $23,136 Not Implemented
UD0808 # 09 Y:2009 09 2009 COVER OPEN TANKS $25,313 $0 Not Implemented
UD0808 # 10 Y:2009 10 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,771 $1,840 Not Implemented