Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
748
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0068 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,854 | $5,078 | Not Implemented |
LM0068 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,564 | $0 | Not Implemented |
LM0068 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $349 | $267 | Not Implemented |
LM0068 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,866 | $16,975 | Not Implemented |
LM0068 # 05 Y:2004 | 05 | 2004 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,181 | $260 | Implemented |
LM0068 # 06 Y:2004 | 06 | 2004 | INSULATE BARE EQUIPMENT | $1,079 | $120 | Not Implemented |
LM0068 # 07 Y:2004 | 07 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,489 | $368 | Implemented |
LM0068 # 08 Y:2004 | 08 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $40,318 | $55,000 | Not Implemented |
LM0068 # 09 Y:2004 | 09 | 2004 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $13,500 | $0 | Not Implemented |
LM0056 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,587 | $690 | Implemented |
LM0056 # 02 Y:2003 | 02 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $7,713 | $0 | Implemented |
LM0056 # 03 Y:2003 | 03 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,371 | $1,200 | Not Implemented |
LM0056 # 04 Y:2003 | 04 | 2003 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $300,000 | $5,000 | Not Implemented |
LM0056 # 05 Y:2003 | 05 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $450,000 | $20,000 | n/a |
LM0056 # 06 Y:2003 | 06 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,754 | $1,968 | Not Implemented |
LM0056 # 07 Y:2003 | 07 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,330 | $6,675 | Not Implemented |
LM0056 # 08 Y:2003 | 08 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $35,000 | $28,714 | n/a |
LM0056 # 09 Y:2003 | 09 | 2003 | INSULATE BARE EQUIPMENT | $3,504 | $1,726 | Not Implemented |
LM0056 # 10 Y:2003 | 10 | 2003 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $356 | $0 | Not Implemented |
SD0313 # 01 Y:2003 | 01 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $58,217 | $20,000 | Not Implemented |
SD0313 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,529 | $11,275 | Not Implemented |
SD0313 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,447 | $14,000 | Not Implemented |
SD0313 # 04 Y:2003 | 04 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,406 | $0 | Not Implemented |
SD0313 # 05 Y:2003 | 05 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $5,962 | $1,350 | Not Implemented |
SD0313 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,860 | $160 | Implemented |