Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

582

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0207 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,328 $8,300 Implemented
LE0207 # 04 Y:2005 04 2005 INSTALL TIMERS AND/OR THERMOSTATS $5,300 $4,500 Not Implemented
LE0207 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,115 $1,000 Implemented
LE0207 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $1,341 $500 Implemented
LE0207 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $851 $500 Implemented
LE0200 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,210 $3,000 Implemented
LE0200 # 02 Y:2004 02 2004 AIR CONDITION ONLY SPACE NECESSARY $9,386 $360 Not Implemented
LE0200 # 03 Y:2004 03 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,305 $800 Implemented
LE0200 # 04 Y:2004 04 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,878 $4,000 Implemented
LE0200 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,266 $750 Implemented
LE0200 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,198 $0 Implemented
LE0200 # 07 Y:2004 07 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,132 $400 Implemented
LE0200 # 08 Y:2004 08 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $904 $500 Implemented
LE0200 # 09 Y:2004 09 2004 IMPROVE COMBUSTION CONTROL CAPABILITY $857 $200 Implemented
LE0200 # 10 Y:2004 10 2004 USE OPTIMUM THICKNESS INSULATION $768 $300 Implemented
LE0200 # 11 Y:2004 11 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $657 $380 Implemented
LE0197 # 01 Y:2004 01 2004 AUTOMATE FINISHING PROCESS $269,280 $300,000 Implemented
LE0197 # 02 Y:2004 02 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $55,434 $60,000 Implemented
LE0197 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $52,852 $10,000 Implemented
LE0197 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,606 $2,484 Implemented
LE0197 # 05 Y:2004 05 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $35,862 $150,000 Not Implemented
LE0197 # 06 Y:2004 06 2004 INSULATE FEEDWATER TANK $22,098 $50,000 Not Implemented
LE0197 # 07 Y:2004 07 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $864 $840 Implemented
SU0176 # 01 Y:2004 01 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $50 $0 Not Implemented
SU0176 # 02 Y:2004 02 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $19,192 $4,348 Implemented