IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

930

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0305 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $17,877 $1,112 Implemented
UM0305 # 04 Y:2006 04 2006 USE OPTIMUM THICKNESS INSULATION $16,577 $47,224 Not Implemented
UM0305 # 05 Y:2006 05 2006 USE OPTIMUM THICKNESS INSULATION $12,021 $4,834 Implemented
UM0305 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,329 $4,720 Implemented
UM0305 # 07 Y:2006 07 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,689 $4,660 Implemented
UM0305 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $2,049 $1,300 Not Implemented
UM0305 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,248 $75 Implemented
UM0305 # 10 Y:2006 10 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $527 $2,145 Not Implemented
UM0305 # 11 Y:2006 11 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $160 $200 Not Implemented
UD0742 # 01 Y:2006 01 2006 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $314,266 $2,000,000 Not Implemented
UD0742 # 02 Y:2006 02 2006 UPGRADE CONTROLS ON COMPRESSORS $198,228 $100,000 Implemented
UD0742 # 03 Y:2006 03 2006 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $185,439 $0 Not Implemented
UD0742 # 04 Y:2006 04 2006 REDESIGN PROCESS $174,377 $0 Implemented
UD0742 # 05 Y:2006 05 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $157,269 $50,000 Not Implemented
UD0742 # 06 Y:2006 06 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $141,723 $50,000 Not Implemented
UD0742 # 07 Y:2006 07 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $67,853 $0 Not Implemented
UD0742 # 08 Y:2006 08 2006 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $67,500 $39,000 Not Implemented
UD0742 # 09 Y:2006 09 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $55,855 $10,000 Implemented
UD0742 # 10 Y:2006 10 2006 USE OPTIMUM THICKNESS INSULATION $42,660 $15,558 Not Implemented
UD0742 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,660 $122,500 Implemented
UD0742 # 12 Y:2006 12 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,230 $0 Implemented
UD0742 # 13 Y:2006 13 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,813 $51,160 Not Implemented
UD0742 # 14 Y:2006 14 2006 UPGRADE CONTROLS ON COMPRESSORS $17,949 $0 Implemented
UD0742 # 15 Y:2006 15 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,232 $5,000 Not Implemented
UD0742 # 16 Y:2006 16 2006 REDUCE WATER USE WITH COUNTER CURRENT RINSING $7,083 $0 Implemented