IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,364

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0312 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,518 $17,604 Implemented
SF0312 # 11 Y:2005 11 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,972 $4,622 Implemented
SF0312 # 12 Y:2005 12 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,062 $101,583 Not Implemented
SF0312 # 13 Y:2005 13 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,414 $27,090 Implemented
UD0726 # 01 Y:2005 01 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $222,216 $3,730 Implemented
UD0726 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $157,981 $295,540 Not Implemented
UD0726 # 03 Y:2005 03 2005 USE OPTIMUM THICKNESS INSULATION $113,135 $17,165 Not Implemented
UD0726 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $93,662 $72,100 Implemented
UD0726 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,707 $93,840 Implemented
UD0726 # 06 Y:2005 06 2005 REDUCE VENTILATION AIR $26,800 $0 Implemented
UD0726 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $19,788 $4,000 Implemented
UD0726 # 08 Y:2005 08 2005 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $19,593 $40,000 Not Implemented
UD0726 # 09 Y:2005 09 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,470 $3,940 Not Implemented
UD0726 # 10 Y:2005 10 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,819 $12,560 Implemented
UD0726 # 11 Y:2005 11 2005 COVER OPEN TANKS $4,429 $1,200 Implemented
UD0726 # 12 Y:2005 12 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,280 $736 Implemented
UD0726 # 13 Y:2005 13 2005 UPGRADE CONTROLS ON COMPRESSORS $3,679 $0 Implemented
UD0726 # 14 Y:2005 14 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,948 $500 Not Implemented
UD0726 # 15 Y:2005 15 2005 CHECK FOR ACCURACY OF UTILITY / POWER METERS $1,554 $0 Implemented
UD0726 # 16 Y:2005 16 2005 UPGRADE CONTROLS ON COMPRESSORS $1,253 $0 Implemented
UD0726 # 17 Y:2005 17 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $412 $960 Implemented
SD0370 # 01 Y:2005 01 2005 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $19,420 $28,950 Not Implemented
SD0370 # 02 Y:2005 02 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,581 $22,500 Not Implemented
SD0370 # 03 Y:2005 03 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,916 $25,000 Not Implemented
SD0370 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,267 $160 Not Implemented