Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,321
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0279 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,368 | $11,810 | Not Implemented |
SF0279 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $1,168 | $1,200 | Not Implemented |
SF0279 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,520 | $13,375 | Implemented |
SF0279 # 05 Y:2004 | 05 | 2004 | OPTIMIZE PLANT POWER FACTOR | $1,079 | $1,376 | Not Implemented |
UD0691 # 01 Y:2004 | 01 | 2004 | MINIMIZE WATER USAGE | $20,840 | $1,380 | Not Implemented |
UD0691 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,415 | $18,250 | Not Implemented |
UD0691 # 03 Y:2004 | 03 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,885 | $630 | Implemented |
UD0691 # 04 Y:2004 | 04 | 2004 | OPTIMIZE PLANT POWER FACTOR | $5,450 | $8,600 | Not Implemented |
UD0691 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,290 | $16,271 | Not Implemented |
UD0691 # 06 Y:2004 | 06 | 2004 | DISCONNECT BALLASTS | $4,541 | $68 | Implemented |
UD0691 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,530 | $630 | Implemented |
UD0691 # 08 Y:2004 | 08 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,020 | $0 | Not Implemented |
UD0691 # 09 Y:2004 | 09 | 2004 | USE PHOTOCELL CONTROLS | $890 | $220 | Implemented |
UD0691 # 10 Y:2004 | 10 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $790 | $0 | Implemented |
UD0691 # 11 Y:2004 | 11 | 2004 | REDUCE FLUID FLOW RATES | $177 | $0 | Not Implemented |
SU0180 # 01 Y:2004 | 01 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $20,507 | $0 | Implemented |
SU0180 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,590 | $0 | Implemented |
SU0180 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,884 | $0 | Implemented |
SU0180 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $964 | $0 | Implemented |
SU0180 # 05 Y:2004 | 05 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,647 | $712 | Not Implemented |
SU0180 # 06 Y:2004 | 06 | 2004 | ADD AREA LIGHTING SWITCHES | $291 | $680 | Implemented |
AS0373 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,560 | $8,230 | Not Implemented |
AS0373 # 02 Y:2004 | 02 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $504 | $456 | Not Implemented |
AS0373 # 03 Y:2004 | 03 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $337 | $1,400 | Not Implemented |
AS0373 # 04 Y:2004 | 04 | 2004 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $28,518 | $60,100 | Not Implemented |