IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,344

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0394 # 02 Y:2022 02 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $22,395 $11,275 Not Implemented
MS0394 # 03 Y:2022 03 2022 REPLACE BOILER $28,522 $145,930 Not Implemented
IC0259 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $914 $50 Not Implemented
IC0259 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,350 $730 Not Implemented
IC0259 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,107 $15,295 Not Implemented
IC0259 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,393 $953 Not Implemented
TT0271 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,479 $1,500 Implemented
TT0271 # 02 Y:2022 02 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,358 $15,000 Not Implemented
TT0271 # 03 Y:2022 03 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $3,012 $0 Implemented
TT0271 # 04 Y:2022 04 2022 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $2,610 $12,000 Not Implemented
TT0271 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,410 $3,000 Implemented
TT0271 # 06 Y:2022 06 2022 ADJUST BURNERS FOR EFFICIENT OPERATION $1,316 $1,500 Implemented
TT0271 # 07 Y:2022 07 2022 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,050 $640 Not Implemented
TT0271 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,041 $1,262 Not Implemented
TT0271 # 09 Y:2022 09 2022 INSTALL TIMERS AND/OR THERMOSTATS $435 $200 Implemented
TT0271 # 10 Y:2022 10 2022 UPGRADE CONTROLS ON COMPRESSORS $237 $600 Implemented
UU0196 # 01 Y:2022 01 2022 CHECK FOR ACCURACY OF UTILITY / POWER METERS $10,923 $250 Implemented
UU0196 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,577 $2,577 Not Implemented
UU0196 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $1,732 $7,647 Implemented
UU0196 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,096 $323 Implemented
UU0196 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $779 $750 Implemented
UU0196 # 06 Y:2022 06 2022 INSTALL TIMERS AND/OR THERMOSTATS $510 $640 Implemented
TT0265 # 01 Y:2022 01 2022 INSULATE BARE EQUIPMENT $12,477 $2,065 Not Implemented
TT0265 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,704 $9,000 Not Implemented
TT0265 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,587 $3,967 Implemented