IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,321

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0290 # 06 Y:2002 06 2002 USE OPTIMUM TEMPERATURE $234,181 $2,080 Not Implemented
UF0290 # 07 Y:2002 07 2002 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $3,259 $1,633 Not Implemented
UF0290 # 08 Y:2002 08 2002 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,947 $2,300 Not Implemented
UF0290 # 09 Y:2002 09 2002 USE TANKS WITH A CONICAL BOTTOM OUTLET SECTION TO REDUCE WASTE ASSOCIATED WITH THE INTERFACE OF TWO LIQUIDS $17,094 $0 Not Implemented
UF0290 # 10 Y:2002 10 2002 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $174,200 $0 Not Implemented
UF0290 # 11 Y:2002 11 2002 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $138,643 $29,000 Not Implemented
MI0026 # 01 Y:2002 01 2002 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $26,325 $45,000 Not Implemented
MI0026 # 02 Y:2002 02 2002 CONDENSE OPERATION INTO ONE BUILDING $23,625 $714 Implemented
MI0026 # 03 Y:2002 03 2002 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $16,250 $60 Implemented
MI0026 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,497 $60 Implemented
MI0026 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $160 $2 Implemented
LM0028 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $10,685 $980 Implemented
LM0028 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $4,363 $2,200 Not Implemented
LM0028 # 03 Y:2002 03 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $49,880 $53,000 Not Implemented
LM0028 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,807 $800 Implemented
LM0028 # 05 Y:2002 05 2002 INSTALL SKYLIGHTS $5,597 $10,400 Not Implemented
LM0028 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,289 $14,371 Not Implemented
LM0028 # 07 Y:2002 07 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $147,649 $242,050 Not Implemented
LM0028 # 08 Y:2002 08 2002 MODIFY WORKLOAD $202,176 $2,200 Implemented
LM0028 # 09 Y:2002 09 2002 INSTALL SYSTEM TO COLLECT SCRAP $23,190 $13,500 Not Implemented
LM0028 # 10 Y:2002 10 2002 DEVELOP STANDARD OPERATING PROCEDURES $15,600 $1,780 Not Implemented
UD0637 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,187 $8,190 Implemented
UD0637 # 02 Y:2002 02 2002 REPROCESS SPENT OILS ON SITE FOR RE-USE $3,149 $3,200 Implemented
UD0637 # 03 Y:2002 03 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,139 $9,000 Implemented
UD0637 # 04 Y:2002 04 2002 DISCONNECT BALLASTS $549 $0 Not Implemented