IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,321

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0016 # 02 Y:2001 02 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,313 $6,313 n/a
IC0016 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $1,123 $2,769 n/a
IC0016 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,259 $1,795 n/a
IC0016 # 05 Y:2001 05 2001 USE OPTIMUM THICKNESS INSULATION $4,304 $3,360 n/a
IC0016 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $668 $328 n/a
IC0016 # 07 Y:2001 07 2001 INSTALL SET-BACK TIMERS $2,723 $2,500 n/a
IC0016 # 08 Y:2001 08 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $76,800 $8,000 n/a
WV0226 # 01 Y:2001 01 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,373 $0 Implemented
WV0226 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,673 $1,100 Implemented
WV0226 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $4,794 $1,008 Implemented
WV0226 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $2,882 $336 Implemented
WV0226 # 05 Y:2001 05 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,676 $7,960 Not Implemented
WV0226 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,563 $280 Not Implemented
WV0226 # 07 Y:2001 07 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,005 $1,000 Not Implemented
WV0226 # 08 Y:2001 08 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,542 $100 Implemented
WV0226 # 09 Y:2001 09 2001 RECOVER WASTE HEAT FROM EQUIPMENT $3,535 $6,000 Not Implemented
WV0226 # 10 Y:2001 10 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,863 $1,200 Implemented
WV0226 # 11 Y:2001 11 2001 RECYCLE CLEANING SOLVENT AND REUSE $43,200 $36,000 Not Implemented
WV0226 # 12 Y:2001 12 2001 ADVERTISE PRODUCT OR SERVICE $312,500 $2,000 Implemented
WV0226 # 13 Y:2001 13 2001 CLEAR AND RENT EXISTING SPACE $12,100 $360 Not Implemented
OK0623 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,052 $6,513 Implemented
OK0623 # 02 Y:2001 02 2001 USE OPTIMUM THICKNESS INSULATION $8,776 $550 Implemented
OK0623 # 03 Y:2001 03 2001 INSTALL SET-BACK TIMERS $6,800 $1,035 Not Implemented
OK0623 # 04 Y:2001 04 2001 REPAIR AND ELIMINATE STEAM LEAKS $1,256 $200 Implemented
OK0623 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $614 $245 Not Implemented