IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,364

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0102 # 07 Y:2001 07 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,323 $0 Not Implemented
SU0101 # 01 Y:2001 01 2001 RECYCLE CASTING SAND $35,529 $45,000 Implemented
SU0101 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $370 $0 Implemented
SU0101 # 03 Y:2001 03 2001 AIR CONDITION ONLY SPACE NECESSARY $176 $253 Not Implemented
SU0101 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $2,500 $8,350 Not Implemented
UM0182 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $568 $375 Implemented
UM0182 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $361 $1,000 Not Implemented
UM0182 # 03 Y:2001 03 2001 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $57,900 $28,900 Implemented
UM0182 # 04 Y:2001 04 2001 RECOVER WASTE HEAT FROM EQUIPMENT $43,000 $100,000 Not Implemented
WI0388 # 01 Y:2001 01 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $10,705 $54,000 Not Implemented
WI0388 # 02 Y:2001 02 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,134 $0 Not Implemented
WI0388 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,744 $1,580 Not Implemented
WI0388 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,411 $480 Not Implemented
WI0388 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,265 $1,000 Not Implemented
WI0388 # 06 Y:2001 06 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $613 $562 Not Implemented
WI0388 # 07 Y:2001 07 2001 INSTALL TIMERS AND/OR THERMOSTATS $336 $200 Not Implemented
WI0388 # 08 Y:2001 08 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $190 $0 Not Implemented
UM0181 # 01 Y:2001 01 2001 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $300 $300 Not Implemented
UM0181 # 02 Y:2001 02 2001 USE OPTIMUM THICKNESS INSULATION $3,470 $3,540 Not Implemented
UM0181 # 03 Y:2001 03 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $94,100 $71,000 Not Implemented
UM0181 # 04 Y:2001 04 2001 IMPROVE SPACE COMFORT CONDITIONING $4,520 $8,000 Not Implemented
BD0180 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,395 $1,555 Not Implemented
BD0180 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,121 $700 Not Implemented
BD0180 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $966 $0 Not Implemented
BD0180 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $702 $450 Not Implemented