Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,344
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0161 # 09 Y:2021 | 09 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $214 | $933 | Not Implemented |
CW0117 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,860 | $6,780 | Implemented |
CW0117 # 02 Y:2020 | 02 | 2020 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $20,258 | $28,161 | Not Implemented |
CW0117 # 03 Y:2020 | 03 | 2020 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $621 | $1,288 | Not Implemented |
CW0117 # 04 Y:2020 | 04 | 2020 | HEAT WATER WITH EXHAUST HEAT | $1,331 | $2,149 | Implemented |
CW0117 # 05 Y:2020 | 05 | 2020 | RECYCLE WHITE WATER | $2,598 | $6,039 | Implemented |
CW0117 # 06 Y:2020 | 06 | 2020 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $217,090 | $846,410 | Implemented |
CW0117 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,334 | $255 | Implemented |
CW0117 # 08 Y:2020 | 08 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $11,576 | $32,850 | Not Implemented |
CW0117 # 09 Y:2020 | 09 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,222 | $15,730 | Not Implemented |
CW0117 # 10 Y:2020 | 10 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $879 | $5,742 | Implemented |
LS2008 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $255 | $25 | Implemented |
LS2008 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,491 | $1,125 | Implemented |
LS2008 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $188 | $50 | Not Implemented |
LS2008 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,024 | $8,534 | Implemented |
LS2008 # 05 Y:2020 | 05 | 2020 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $89 | $110 | Not Implemented |
LS2008 # 06 Y:2020 | 06 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $327 | $412 | Implemented |
UU0177 # 01 Y:2021 | 01 | 2021 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $57,706 | $128,174 | Not Implemented |
UU0177 # 02 Y:2021 | 02 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $36,240 | $6,760 | Implemented |
UU0177 # 03 Y:2021 | 03 | 2021 | USE RADIANT HEATER FOR SPOT HEATING | $32,792 | $101,000 | Not Implemented |
UU0177 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,515 | $5,046 | Implemented |
UU0177 # 05 Y:2021 | 05 | 2021 | OPTIMIZE PLANT POWER FACTOR | $10,455 | $14,250 | Implemented |
UU0177 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,132 | $22,614 | Not Implemented |
UU0177 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,105 | $11,650 | Implemented |
UU0177 # 08 Y:2021 | 08 | 2021 | REDUCE VENTILATION AIR | $4,129 | $4,000 | Implemented |