IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

772

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0106 # 05 Y:1998 05 1998 INSTALL OCCUPANCY SENSORS $967 $650 Not Implemented
BD0106 # 06 Y:1998 06 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $85,424 $67,500 Not Implemented
BD0106 # 07 Y:1998 07 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $10,330 $210 Not Implemented
BD0106 # 08 Y:1998 08 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $154,560 $23,000 Not Implemented
WI0302 # 01 Y:1997 01 1997 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $285,742 $770,000 Not Implemented
WI0302 # 02 Y:1997 02 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $19,558 $25,000 Not Implemented
WI0302 # 03 Y:1997 03 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $17,370 $0 Not Implemented
WI0302 # 04 Y:1997 04 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,350 $5,000 Not Implemented
WI0302 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,522 $500 Implemented
WI0302 # 06 Y:1997 06 1997 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $6,051 $7,000 Not Implemented
WI0302 # 07 Y:1997 07 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,805 $0 Implemented
WI0302 # 08 Y:1997 08 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,649 $5,500 Not Implemented
WI0302 # 09 Y:1997 09 1997 INSTALL OCCUPANCY SENSORS $281 $600 Not Implemented
BD0087 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,443 $40,890 Implemented
BD0087 # 02 Y:1997 02 1997 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $7,026 $8,500 Not Implemented
BD0087 # 03 Y:1997 03 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $5,680 $5,100 Implemented
BD0087 # 04 Y:1997 04 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,171 $3,750 Not Implemented
BD0087 # 05 Y:1997 05 1997 INSTALL OCCUPANCY SENSORS $1,365 $1,125 Implemented
BD0087 # 06 Y:1997 06 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $10,295 $7,000 Implemented
BD0087 # 07 Y:1997 07 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $14,951 $3,000 Implemented
WI0292 # 01 Y:1997 01 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $15,413 $3,500 Not Implemented
WI0292 # 02 Y:1997 02 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $15,195 $2,297 Implemented
WI0292 # 03 Y:1997 03 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,007 $0 Not Implemented
WI0292 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $416 $610 Not Implemented
WI0292 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $366 $1,280 Not Implemented