IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,364

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0163 # 04 Y:1999 04 1999 USE OPTIMUM THICKNESS INSULATION $11,267 $1,408 Not Implemented
AR0163 # 05 Y:1999 05 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $251,669 $66,400 Not Implemented
AR0163 # 06 Y:1999 06 1999 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $3,065 $225 Not Implemented
TN0661 # 01 Y:1999 01 1999 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $175,335 $5,000 Implemented
TN0661 # 02 Y:1999 02 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $91,400 $49,760 Not Implemented
TN0661 # 03 Y:1999 03 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $73,031 $8,750 Not Implemented
TN0661 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $72,160 $93,000 Not Implemented
TN0661 # 05 Y:1999 05 1999 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $39,290 $2,720 Not Implemented
TN0661 # 06 Y:1999 06 1999 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $25,103 $30,600 Implemented
TN0661 # 07 Y:1999 07 1999 METER WASTE WATER $13,500 $3,700 Not Implemented
TN0661 # 08 Y:1999 08 1999 INSTALL TIMERS AND/OR THERMOSTATS $6,500 $650 Not Implemented
UD0571 # 01 Y:1999 01 1999 RECYCLE CASTING SAND $227,844 $135,000 Implemented
UD0571 # 02 Y:1999 02 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $67,000 $24,000 Not Implemented
UD0571 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $27,700 $40,000 Not Implemented
UD0571 # 04 Y:1999 04 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $21,000 $64,000 Implemented
UD0571 # 05 Y:1999 05 1999 CONVERT TO AQUEOUS CLEANING SYSTEM $18,667 $0 Not Implemented
UD0571 # 06 Y:1999 06 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,800 $0 Not Implemented
UD0571 # 07 Y:1999 07 1999 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $9,000 $24,000 Not Implemented
UD0571 # 08 Y:1999 08 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,582 $0 Implemented
UD0571 # 09 Y:1999 09 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,489 $0 Not Implemented
DS0141 # 01 Y:1999 01 1999 PREHEAT COMBUSTION AIR WITH WASTE HEAT $10,285 $24,040 Implemented
DS0141 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $4,260 $4,500 Implemented
DS0141 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,031 $700 Implemented
DS0141 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,348 $900 Implemented
DS0141 # 05 Y:1999 05 1999 UPGRADE OBSOLETE EQUIPMENT $13,679 $32,000 Implemented