Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,344
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0242 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,412 | $62,026 | Not Implemented |
TT0242 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,394 | $110,050 | Not Implemented |
TT0242 # 04 Y:2020 | 04 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $13,945 | $1,900 | Not Implemented |
TT0242 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,251 | $263 | Not Implemented |
TT0242 # 06 Y:2020 | 06 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $1,854 | $1,700 | Not Implemented |
OK1033 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,433 | $2,100 | Implemented |
OK1033 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,570 | $27,786 | Implemented |
OK1033 # 03 Y:2020 | 03 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $262 | $700 | Implemented |
OK1033 # 04 Y:2020 | 04 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $343 | $0 | Not Implemented |
OK1033 # 05 Y:2020 | 05 | 2020 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,056 | $671 | Not Implemented |
IP0136 # 01 Y:2020 | 01 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $672 | $0 | Implemented |
IP0136 # 02 Y:2020 | 02 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $921 | $0 | Implemented |
IP0136 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,490 | $131 | Not Implemented |
IP0136 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,455 | $69 | Implemented |
IP0136 # 05 Y:2020 | 05 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $12,685 | $10,860 | Implemented |
IP0136 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,563 | $32,451 | Implemented |
IP0136 # 07 Y:2020 | 07 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,172 | $8,600 | Implemented |
AS0487 # 01 Y:2020 | 01 | 2020 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $502,983 | $7,794 | Not Implemented |
AS0487 # 02 Y:2020 | 02 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $51,986 | $394,050 | Not Implemented |
AS0487 # 03 Y:2020 | 03 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,819 | $29,360 | Not Implemented |
AS0487 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,784 | $10,912 | Not Implemented |
AS0487 # 05 Y:2020 | 05 | 2020 | USE PHOTOCELL CONTROLS | $12,092 | $5,188 | Not Implemented |
WM0157 # 01 Y:2020 | 01 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $59,393 | $500,000 | Not Implemented |
WM0157 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $32,506 | $160,650 | Not Implemented |
WM0157 # 03 Y:2020 | 03 | 2020 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $18,997 | $0 | Implemented |