Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,462
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1100 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $12,387 | $23,400 | n/a |
UD1100 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,770 | $1,235 | n/a |
UD1100 # 03 Y:2025 | 03 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $879 | $0 | n/a |
UD1100 # 02 Y:2025 | 02 | 2025 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,520 | $1,237 | n/a |
UD1100 # 01 Y:2025 | 01 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $118 | $0 | n/a |
UD1100 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,007 | $15,430 | n/a |
UD1100 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $5,242 | $7,768 | n/a |
WM0233 # 06 Y:2025 | 06 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $329 | $810 | n/a |
WM0233 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $373 | $3,136 | n/a |
WM0233 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,278 | $0 | n/a |
WM0233 # 03 Y:2025 | 03 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $2,094 | $18,160 | n/a |
WM0233 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,262 | $1,500 | n/a |
WM0233 # 01 Y:2025 | 01 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $97,017 | $800,000 | n/a |
UL2417 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $55,561 | $524,124 | n/a |
UL2417 # 02 Y:2024 | 02 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $12,753 | $43,234 | n/a |
UL2417 # 03 Y:2024 | 03 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,850 | $39,000 | n/a |
UL2417 # 04 Y:2024 | 04 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,595 | $5,797 | n/a |
UL2417 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $463 | $0 | n/a |
UL2417 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,025 | $525 | n/a |
UL2417 # 07 Y:2024 | 07 | 2024 | INSTALL SPECTRAL REFLECTORS / DELAMP | $900 | $0 | n/a |
UL2417 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $438 | $941 | n/a |
GT0989 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,407 | $2,600 | n/a |
GT0989 # 02 Y:2025 | 02 | 2025 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $200 | $100 | n/a |
GT0989 # 03 Y:2025 | 03 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $42,149 | $150,000 | n/a |
GT0989 # 04 Y:2025 | 04 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $430 | $1,777 | n/a |