Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,344
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0199 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,187 | $12,000 | n/a |
IP0199 # 05 Y:2024 | 05 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,328 | $3,600 | n/a |
IP0199 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,284 | $4,422 | n/a |
IP0199 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,822 | $2,157 | n/a |
IP0199 # 02 Y:2024 | 02 | 2024 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $287 | $25 | n/a |
IP0199 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,242 | $85 | n/a |
UU0256 # 01 Y:2024 | 01 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $43,875 | $401,481 | n/a |
UU0256 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $14,319 | $31,625 | n/a |
UU0256 # 03 Y:2024 | 03 | 2024 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,048 | $11,730 | n/a |
UU0256 # 04 Y:2024 | 04 | 2024 | REDUCE EXCESSIVE BOILER BLOWDOWN | $5,024 | $7,960 | n/a |
UL2408 # 01 Y:2024 | 01 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $77,905 | $42,617 | n/a |
UL2408 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $319,482 | $2,990,386 | n/a |
UL2408 # 03 Y:2024 | 03 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $40,749 | $39,000 | n/a |
NT0026 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,160 | $5,609 | n/a |
NT0026 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $22,341 | $0 | n/a |
NT0026 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $109,656 | $54,987 | n/a |
NT0026 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $122,072 | $90,330 | n/a |
NT0026 # 05 Y:2024 | 05 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $133,205 | $0 | n/a |
AM0914 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,310 | $0 | n/a |
AM0914 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,515 | $0 | n/a |
AM0914 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,190 | $2,260 | n/a |
AM0914 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $40,720 | $77,840 | n/a |
SJ0019 # 09 Y:2024 | 09 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $760 | $1,897 | n/a |
SJ0019 # 08 Y:2024 | 08 | 2024 | RECYCLE CASTING SAND | $75,618 | $775,000 | n/a |
SJ0019 # 07 Y:2024 | 07 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $747 | $6,433 | n/a |