IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

238

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0144 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,060 $800 Implemented
UA0135 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $101,481 $4,160 Not Implemented
UA0135 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,926 $10,430 Implemented
UA0135 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $115,247 $202,454 Not Implemented
UA0135 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,250 $5,480 Not Implemented
UA0135 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,333 $5,604 Not Implemented
UA0135 # 03 Y:2015 03 2015 UPGRADE CONTROLS ON COMPRESSORS $19,427 $5,250 Not Implemented
UA0135 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $79,593 $13,795 Not Implemented
UA0126 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,076 $122,855 Not Implemented
UA0126 # 02 Y:2014 02 2014 DISCONNECT BALLASTS $14,055 $1,200 Not Implemented
UA0126 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,580 $6,440 Not Implemented
UA0126 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,605 $6,195 Not Implemented
UA0126 # 05 Y:2014 05 2014 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $3,304 $583 Implemented
UA0126 # 06 Y:2014 06 2014 INSTALL TIMERS AND/OR THERMOSTATS $4,317 $625 Implemented
UA0126 # 07 Y:2014 07 2014 OPTIMIZE PLANT POWER FACTOR $19,245 $19,520 Not Implemented
UA0115 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,982 $22,285 Not Implemented
UA0115 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,820 $800 Implemented
UA0115 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,145 $2,595 Implemented
UA0115 # 04 Y:2014 04 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,420 $10,540 Not Implemented
UA0115 # 05 Y:2014 05 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,817 $23,475 Not Implemented
UA0115 # 06 Y:2014 06 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $3,192 $1,920 Implemented
UA0115 # 07 Y:2014 07 2014 REDUCE EXCESSIVE BOILER BLOWDOWN $5,071 $6,000 Not Implemented
UA3030 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $71,086 $800 Implemented
UA3030 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $115,835 $27,390 Not Implemented
UA3030 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $76,352 $32,825 Not Implemented