Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,353
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0060 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,112 | $750 | Implemented |
SF0060 # 03 Y:1995 | 03 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,582 | $18,315 | Implemented |
SF0060 # 04 Y:1995 | 04 | 1995 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $876 | $1,291 | Not Implemented |
SF0060 # 05 Y:1995 | 05 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,429 | $1,233 | Implemented |
SF0060 # 06 Y:1995 | 06 | 1995 | USE SYNTHETIC LUBRICANT | $1,512 | $732 | Implemented |
TN0564 # 01 Y:1995 | 01 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $22,299 | $15,600 | Not Implemented |
TN0564 # 02 Y:1995 | 02 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,726 | $0 | Implemented |
TN0564 # 03 Y:1995 | 03 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,969 | $3,000 | Not Implemented |
TN0564 # 04 Y:1995 | 04 | 1995 | CLOSE OFF UNNEEDED STEAM LINES | $1,642 | $0 | Not Implemented |
TN0564 # 05 Y:1995 | 05 | 1995 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $2,743 | $4,800 | Not Implemented |
TN0564 # 06 Y:1995 | 06 | 1995 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,345 | $950 | Not Implemented |
TN0564 # 07 Y:1995 | 07 | 1995 | USE SYNTHETIC LUBRICANT | $4,427 | $0 | Not Implemented |
TN0564 # 08 Y:1995 | 08 | 1995 | USE OPTIMUM TEMPERATURE | $597 | $0 | Not Implemented |
TN0564 # 09 Y:1995 | 09 | 1995 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $77,516 | $0 | Not Implemented |
TN0564 # 10 Y:1995 | 10 | 1995 | RECYCLE WHITE WATER | $32,232 | $31,600 | Not Implemented |
TN0564 # 11 Y:1995 | 11 | 1995 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $25,642 | $38,600 | Not Implemented |
TN0564 # 12 Y:1995 | 12 | 1995 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $9,920 | $0 | Not Implemented |
UM0027 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,047 | $760 | Implemented |
UM0027 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,609 | $14,020 | Implemented |
UM0027 # 03 Y:1995 | 03 | 1995 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,197 | $3,100 | Implemented |
UM0027 # 04 Y:1995 | 04 | 1995 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $4,636 | $1,998 | Not Implemented |
AM0245 # 01 Y:1995 | 01 | 1995 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $20,880 | $69,400 | Not Implemented |
AM0245 # 02 Y:1995 | 02 | 1995 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $21,630 | $0 | Not Implemented |
AM0245 # 03 Y:1995 | 03 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,100 | $800 | Implemented |
AM0245 # 04 Y:1995 | 04 | 1995 | USE SYNTHETIC LUBRICANT | $1,680 | $0 | Not Implemented |