IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,353

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0060 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,112 $750 Implemented
SF0060 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,582 $18,315 Implemented
SF0060 # 04 Y:1995 04 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $876 $1,291 Not Implemented
SF0060 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,429 $1,233 Implemented
SF0060 # 06 Y:1995 06 1995 USE SYNTHETIC LUBRICANT $1,512 $732 Implemented
TN0564 # 01 Y:1995 01 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $22,299 $15,600 Not Implemented
TN0564 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,726 $0 Implemented
TN0564 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,969 $3,000 Not Implemented
TN0564 # 04 Y:1995 04 1995 CLOSE OFF UNNEEDED STEAM LINES $1,642 $0 Not Implemented
TN0564 # 05 Y:1995 05 1995 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,743 $4,800 Not Implemented
TN0564 # 06 Y:1995 06 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,345 $950 Not Implemented
TN0564 # 07 Y:1995 07 1995 USE SYNTHETIC LUBRICANT $4,427 $0 Not Implemented
TN0564 # 08 Y:1995 08 1995 USE OPTIMUM TEMPERATURE $597 $0 Not Implemented
TN0564 # 09 Y:1995 09 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $77,516 $0 Not Implemented
TN0564 # 10 Y:1995 10 1995 RECYCLE WHITE WATER $32,232 $31,600 Not Implemented
TN0564 # 11 Y:1995 11 1995 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $25,642 $38,600 Not Implemented
TN0564 # 12 Y:1995 12 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,920 $0 Not Implemented
UM0027 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,047 $760 Implemented
UM0027 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,609 $14,020 Implemented
UM0027 # 03 Y:1995 03 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,197 $3,100 Implemented
UM0027 # 04 Y:1995 04 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $4,636 $1,998 Not Implemented
AM0245 # 01 Y:1995 01 1995 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $20,880 $69,400 Not Implemented
AM0245 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,630 $0 Not Implemented
AM0245 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,100 $800 Implemented
AM0245 # 04 Y:1995 04 1995 USE SYNTHETIC LUBRICANT $1,680 $0 Not Implemented