IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,344

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0032 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $549 $3,710 Implemented
SD0032 # 02 Y:1992 02 1992 INSTALL TIMERS AND/OR THERMOSTATS $5,950 $200 Implemented
SD0032 # 03 Y:1992 03 1992 RECOVER WASTE HEAT FROM EQUIPMENT $3,288 $1,510 Not Implemented
SD0032 # 04 Y:1992 04 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,038 $0 Implemented
SD0032 # 05 Y:1992 05 1992 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $5,219 $3,900 Not Implemented
SD0032 # 06 Y:1992 06 1992 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $138 $374 Not Implemented
SD0032 # 07 Y:1992 07 1992 INSULATE BARE EQUIPMENT $68 $172 Not Implemented
SD0032 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,350 $1,020 Implemented
SD0032 # 09 Y:1992 09 1992 KEEP LAMPS AND REFLECTORS CLEAN $2,987 $4,750 Not Implemented
SD0032 # 10 Y:1992 10 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,664 $930 Not Implemented
SD0032 # 11 Y:1992 11 1992 INSTALL SET-BACK TIMERS $855 $818 Not Implemented
AM0164 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $93,089 $0 Implemented
AM0164 # 02 Y:1992 02 1992 OPTIMIZE PLANT POWER FACTOR $44,815 $64,750 Implemented
AM0164 # 03 Y:1992 03 1992 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $19,440 $850 Not Implemented
AM0164 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,158 $1,030 Implemented
AM0164 # 05 Y:1992 05 1992 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,200 $419 Not Implemented
AM0164 # 06 Y:1992 06 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,140 $910 Implemented
ND0045 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,000 $25,240 Implemented
ND0045 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,840 $579 Implemented
ND0045 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,324 $1,000 Implemented
ND0045 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,874 $1,000 Not Implemented
ND0045 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29 $44 Implemented
KU0378 # 01 Y:1992 01 1992 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $29,220 $100,000 Not Implemented
KU0378 # 02 Y:1992 02 1992 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,344 $0 Not Implemented
KU0378 # 03 Y:1992 03 1992 OPTIMIZE PLANT POWER FACTOR $10,253 $6,000 Not Implemented