Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

241

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0301 # 06 Y:2011 06 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $496 $895 Not Implemented
SU0301 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $377 $487 Not Implemented
SU0301 # 04 Y:2011 04 2011 RECOVER AND REUSE SPENT ACID BATHS $1,049 $958 Not Implemented
SU0301 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $2,477 $2,028 Implemented
SU0301 # 02 Y:2011 02 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,978 $689 Not Implemented
SU0301 # 01 Y:2011 01 2011 USE POWER DURING OFF-PEAK PERIODS $4,632 $0 Not Implemented
SU0298 # 09 Y:2010 09 2010 OPTIMIZE PLANT POWER FACTOR $4,349 $17,933 Not Implemented
SU0298 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,123 $45,613 Not Implemented
SU0298 # 07 Y:2010 07 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $35,873 $81,798 Not Implemented
SU0298 # 06 Y:2010 06 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $125 $274 Not Implemented
SU0298 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $792 $266 Not Implemented
SU0298 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $431 $86 Not Implemented
SU0298 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $9,218 $1,248 Not Implemented
SU0298 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,096 $0 Not Implemented
SU0298 # 01 Y:2010 01 2010 PAY BILLS ON TIME TO AVOID LATE FEES $21,457 $0 Not Implemented
SU0280 # 11 Y:2009 11 2009 OPTIMIZE PLANT POWER FACTOR $2,725 $7,949 Implemented
SU0280 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,297 $0 Implemented
SU0280 # 02 Y:2009 02 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,999 $0 Implemented
SU0280 # 03 Y:2009 03 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,445 $0 Implemented
SU0280 # 04 Y:2009 04 2009 USE SYNTHETIC LUBRICANT $1,438 $0 Not Implemented
SU0280 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,497 $378 Implemented
SU0280 # 07 Y:2009 07 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,497 $3,768 Implemented
SU0280 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $4,873 $1,477 Implemented
SU0280 # 10 Y:2009 10 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $644 $1,009 Not Implemented
SU0280 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $344 $405 Not Implemented