IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

930

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0962 # 03 Y:2017 03 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,226 $3,000 Not Implemented
UD0962 # 04 Y:2017 04 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,906 $23,600 Not Implemented
UD0962 # 05 Y:2017 05 2017 INSTALL AUTOMATIC STACK DAMPER $847 $1,050 Not Implemented
UD0962 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,115 $20,000 Not Implemented
UD0962 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $7,630 $8,990 Implemented
UD0962 # 08 Y:2017 08 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,049 $17,049 Not Implemented
UD0962 # 09 Y:2017 09 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,808 $5,292 Not Implemented
UD0962 # 10 Y:2017 10 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,104 $1,000 Implemented
WV0531 # 10 Y:2016 10 2016 DEVELOP A REPAIR/REPLACE POLICY $256 $649 Implemented
WV0531 # 09 Y:2016 09 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $956 $1,000 Implemented
WV0531 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,225 $4,010 Implemented
WV0531 # 07 Y:2016 07 2016 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) $2,730 $2,795 Not Implemented
WV0531 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,891 $8,624 Implemented
WV0531 # 05 Y:2016 05 2016 INSTALL SET-BACK TIMERS $4,942 $0 Implemented
WV0531 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,464 $4,100 Implemented
WV0531 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $12,371 $25,305 Implemented
WV0531 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,039 $63,000 Not Implemented
WV0531 # 01 Y:2016 01 2016 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $19,064 $33,000 Not Implemented
UD0948 # 01 Y:2016 01 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $353,342 $60,000 Not Implemented
UD0948 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $23,367 $2,838 Not Implemented
UD0948 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $49,905 $20,000 Not Implemented
UD0948 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,398 $0 Implemented
UD0948 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,997 $50 Not Implemented
UD0948 # 06 Y:2016 06 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $87,713 $52,000 Implemented
UD0948 # 07 Y:2016 07 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $38,094 $0 Implemented