IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

582

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0389 # 06 Y:2015 06 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,484 $20,000 Not Implemented
LE0390 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,174 $28 Not Implemented
LE0390 # 02 Y:2015 02 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,972 $5,400 Not Implemented
LE0390 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,489 $1,000 Not Implemented
LE0390 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $398 $75 Not Implemented
LE0390 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $558 $120 Not Implemented
LE0390 # 06 Y:2015 06 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $47,479 $25,500 Implemented
LE0390 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,361 $2,457 Not Implemented
LE0390 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,333 $5,028 Not Implemented
LE0390 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $3,974 $7,332 Not Implemented
LE0390 # 10 Y:2015 10 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,602 $5,200 Not Implemented
LE0356 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,905 $5,175 Implemented
LE0356 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,126 $3,215 Implemented
LE0356 # 03 Y:2013 03 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,894 $51,200 Not Implemented
LE0356 # 04 Y:2013 04 2013 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $146 $338 Not Implemented
LE0356 # 05 Y:2013 05 2013 ADJUST BURNERS FOR EFFICIENT OPERATION $756 $0 Implemented
LE0356 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,451 $520 Not Implemented
LE0356 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,343 $1,000 Not Implemented
LE0356 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,139 $1,500 Not Implemented
LE0356 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,341 $0 Implemented
LE0356 # 10 Y:2013 10 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,399 $3,700 Implemented
LE0356 # 11 Y:2013 11 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,608 $25,060 Not Implemented
LE0356 # 12 Y:2013 12 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,638 $1,086 Implemented
LE0354 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,024 $8,775 Not Implemented
LE0354 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,533 $21 Implemented