Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,344
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0454 # 01 Y:2018 | 01 | 2018 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,250 | $2,600 | Implemented |
SU0454 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,562 | $2,313 | Implemented |
SU0454 # 03 Y:2018 | 03 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $631 | $1,100 | Implemented |
SU0454 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $201 | $168 | Implemented |
SU0454 # 05 Y:2018 | 05 | 2018 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $624 | $702 | Implemented |
SU0454 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $609 | $1,336 | Implemented |
IP0096 # 03 Y:2018 | 03 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $26,438 | $4,500 | Not Implemented |
IP0096 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,979 | $2,680 | Implemented |
IP0096 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $31,331 | $6 | Implemented |
IP0096 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,206 | $905 | Implemented |
IP0096 # 07 Y:2018 | 07 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $13,560 | $30,000 | Not Implemented |
IP0096 # 08 Y:2018 | 08 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,917 | $12,782 | Implemented |
IP0096 # 09 Y:2018 | 09 | 2018 | USE OPTIMUM THICKNESS INSULATION | $18,548 | $984 | Implemented |
IP0096 # 10 Y:2018 | 10 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,834 | $68,658 | Implemented |
IP0096 # 11 Y:2018 | 11 | 2018 | ADD AREA LIGHTING SWITCHES | $1,738 | $130 | Implemented |
IP0096 # 12 Y:2018 | 12 | 2018 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $180,631 | $300,000 | Not Implemented |
UD0979 # 01 Y:2018 | 01 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,640 | $0 | Implemented |
UD0979 # 02 Y:2018 | 02 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $7,096 | $0 | Not Implemented |
UD0979 # 03 Y:2018 | 03 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $26,438 | $4,500 | Not Implemented |
UD0979 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,299 | $1,000 | Implemented |
UD0979 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $31,331 | $6 | Implemented |
UD0979 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,206 | $905 | Implemented |
UD0979 # 07 Y:2018 | 07 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $13,560 | $30,000 | Not Implemented |
UD0979 # 08 Y:2018 | 08 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,917 | $12,782 | Implemented |
UD0979 # 09 Y:2018 | 09 | 2018 | USE OPTIMUM THICKNESS INSULATION | $18,548 | $984 | Implemented |