IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,344

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0968 # 16 Y:2017 16 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,850 $38,175 Implemented
UD0968 # 17 Y:2017 17 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27,353 $42,400 Implemented
GT0901 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $89,452 $5,000 Implemented
GT0901 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,992 $10,805 Implemented
GT0901 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $1,259 $2,654 Not Implemented
GT0901 # 04 Y:2017 04 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $8,249 $18,040 Not Implemented
GT0901 # 05 Y:2017 05 2017 USE SOLAR HEAT FOR HEAT $52,084 $187,502 Not Implemented
IC0194 # 01 Y:2017 01 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $124,626 $220,275 Implemented
IC0194 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $87,344 $137,763 Implemented
IC0194 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,467 $8,000 Not Implemented
IC0194 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,741 $8,162 Not Implemented
IP0086 # 01 Y:2017 01 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,463 $0 Implemented
IP0086 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,932 $4 Not Implemented
IP0086 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,016 $90 Not Implemented
IP0086 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $137 $8 Implemented
IP0086 # 05 Y:2017 05 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,071 $775 Not Implemented
IP0086 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,677 $1,400 Not Implemented
IP0086 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,028 $7,975 Not Implemented
IP0086 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $522 $204 Implemented
IP0086 # 09 Y:2017 09 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,994 $1,740 Not Implemented
IP0086 # 10 Y:2017 10 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $155 $109 Not Implemented
IP0086 # 11 Y:2017 11 2017 OPTIMIZE PLANT POWER FACTOR $23,517 $28,545 Not Implemented
IP0086 # 12 Y:2017 12 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,582 $3,703 Not Implemented
IP0086 # 13 Y:2017 13 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,424 $31,458 Implemented
OK0968 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,259 $3,000 Implemented